X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355072110000

Well Details

Well ID: 0355072110000
Loading map...
Location: 00/10-21-035-07W5/0
Location Alias: 00/10-21-35-07 W5M
Location Alias 2: 00/10-21-035-07 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 07
Section: 21
County/Municipality: Clearwater County
Well Name: SHININGBANK CAROLINE 10-21-35-7
Operator Name: TAQA North Ltd.
License Number: 0057717
License Date: 1976-03-29
License Status: Issued
Spud Date: 1976-04-06
Final Drill Date: 1976-05-05
Well Total Depth: 2840.10 m
Surface Hole Latitude: 52.023824
Surface Hole Longitude: -114.936405

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-03-29 Obtained License
1976-05-04 Lost Circulation Occurred
1976-05-05 Finished Drilling
1976-05-05 Well Mode changed to Drilled and Cased
1976-05-07 Lost Circulation Occurred
1976-05-07 Production Casing Operation Performed
1976-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-20 Perforation Treatment Performed - Jet Perforation
1976-12-23 Well Began Production
1976-12-23 Well Fluid changed to Crude Oil
1976-12-23 Well Mode changed to Flowing
1986-09-04 Perforation Treatment Performed - Jet Perforation
1986-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-11 Perforation Treatment Performed - Jet Perforation
1987-06-11 Well Log Performed
1987-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-17 Perforation Treatment Performed - Fractured
1988-04-01 Well Fluid changed to Crude Oil
1988-04-01 Well Mode changed to Suspended
2000-09-07 Well Fluid changed to Crude Oil
2000-09-07 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-18 Packing Device Capped w/Cement 2572.50 2572.50 0
1976-12-20 Perforation 2547.20 2548.40 7
1976-12-20 Acid Treatment 2547.20 2548.40 0
1986-09-04 Perforation 2546.30 2549.70 13
1986-12-09 Acid Treatment 2546.30 2549.70 0
1987-06-11 Perforation 2546.30 2549.70 13
1987-06-14 Acid Treatment 2546.30 2549.70 0
1987-06-17 Fracture 2546.30 2549.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 202 0.0 0.0 0.0
1977 1762 0.0 0.0 0.0
1978 3713 0.0 0.0 0.0
1979 4805 0.0 0.0 0.0
1980 2452 0.0 0.0 0.0
1981 3756 0.0 0.0 0.0
1982 3050 0.0 0.0 0.0
1983 1899 0.0 0.0 0.0
1984 1309 0.0 0.0 0.0
1985 3916 0.0 0.0 0.0
1986 6354 0.0 0.0 0.0
1987 4106 0.0 0.0 0.0
1988 1136 0.0 0.0 0.0
2000 2677 0.0 0.0 0.0
2001 8138 0.0 0.0 0.0
2002 7560 0.0 0.0 0.0
2003 7273 0.0 0.0 0.0
2004 5530 0.0 0.0 0.0
2005 8006 0.0 0.0 0.0
2006 8214 0.0 0.0 0.0
2007 8298 0.0 0.0 0.0
2008 3942 0.0 0.0 0.0
2009 3056 0.0 0.0 0.0
2010 8592 0.0 0.0 0.0
2011 8592 0.0 0.0 0.0
2012 7296 0.0 0.0 0.0
2013 6269 0.0 0.0 0.0
2014 8556 0.0 0.0 0.0
2015 8462 0.0 0.0 0.0
2016 8484 0.0 0.0 0.0
2017 8452 0.0 0.0 0.0
2018 6890 0.0 0.0 0.0
2019 3949 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-05-04 Lost Circulation 2807.20 2840.10
1976-05-07 Lost Circulation 2840.10 2840.10

For data sources see[6]

References