X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355071201000

Well Details

Well ID: 0355071201000
Loading map...
Location: 00/01-12-035-07W5/0
Location Alias: 00/01-12-35-07 W5M
Location Alias 2: 00/01-12-035-07 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 07
Section: 12
County/Municipality: Clearwater County
Well Name: AMOCO CAROLINE 1-12-35-7
Operator Name: BP Canada Energy Group ULC
License Number: 0086076
License Date: 1980-10-03
License Status: RecCertified
Spud Date: 1980-10-09
Final Drill Date: 1980-12-06
Well Total Depth: 3121.00 m
Surface Hole Latitude: 51.987100
Surface Hole Longitude: -114.863579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-03 Obtained License
1980-10-09 Lost Circulation Occurred
1980-10-19 Lost Circulation Occurred
1980-12-06 Finished Drilling
1980-12-09 Well Log Performed
1980-12-12 Production Casing Operation Performed
1981-03-12 Perforation Treatment Performed - Jet Perforation
1981-03-13 Perforation Treatment Performed - Jet Perforation
1981-03-18 Perforation Treatment Performed - Jet Perforation
1981-03-20 Perforation Treatment Performed - Jet Perforation
1981-03-21 Perforation Treatment Performed - Jet Perforation
1981-03-22 Perforation Treatment Performed - Jet Perforation
1981-07-07 Perforation Treatment Performed - Jet Perforation
1981-07-22 Perforation Treatment Performed - Fractured
1981-07-22 Perforation Treatment Performed - Jet Perforation
1981-07-27 Well Mode changed to Drilled and Cased
1981-10-05 Perforation Treatment Performed - Jet Perforation
1981-10-14 Perforation Treatment Performed - Fractured
1981-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-24 Perforation Treatment Performed - Cement Plug
1981-11-25 Perforation Treatment Performed - Jet Perforation
1981-11-26 Perforation Treatment Performed - Jet Perforation
1981-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-12-11 Perforation Treatment Performed - Jet Perforation
1981-12-13 Perforation Treatment Performed - Fractured
1982-08-01 Well Began Production
1982-08-01 Well Fluid changed to Crude Oil
1982-08-01 Well Mode changed to Flowing
1982-10-03 Well Fluid changed to Crude Oil
1982-10-03 Well Mode changed to Suspended
1986-11-19 Well Log Performed
1998-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-09 Plug Back Performed
1998-09-09 Well Log Performed
1998-09-11 Perforation Treatment Performed - Jet Perforation
1998-09-11 Well Log Performed
1998-09-12 Perforation Treatment Performed - Cement Squeeze
1998-09-13 Perforation Treatment Performed - Jet Perforation
1998-09-13 Perforation Treatment Performed - Remedial Casing
1998-09-13 Well Log Performed
1998-09-14 Perforation Treatment Performed - Jet Perforation
1998-09-14 Well Log Performed
1998-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-22 Perforation Treatment Performed - Jet Perforation
1998-09-22 Well Log Performed
1998-09-23 Perforation Treatment Performed - Remedial Casing
1998-10-20 Well Abandoned
1998-10-20 Well Fluid changed to Crude Oil
1998-10-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-12 Perforation 3035.50 3035.80 3
1981-07-22 Perforation 2994.50 3007.50 13
1981-07-22 Fracture 2994.50 3007.50 0
1981-10-05 Perforation 2994.00 3007.50 7
1981-10-14 Fracture 2994.00 3007.50 0
1981-10-16 Acid Treatment 2994.00 3007.50 0
1981-11-24 Cement Plug 2986.70 2992.00 0
1981-11-25 Perforation 2980.30 2986.30 13
1981-11-26 Perforation 2976.00 2976.80 13
1981-11-26 Perforation 2977.30 2980.30 13
1981-12-09 Packing Device Capped w/Cement 2948.10 2958.00 0
1981-03-13 Perforation 3047.50 3047.80 3
1981-12-11 Perforation 2767.00 2774.00 13
1981-12-13 Fracture 2767.00 2774.00 0
1998-09-09 Packing Device Capped w/Cement 2752.00 2760.00 0
1998-09-11 Perforation 1025.00 1026.00 14
1998-09-12 Cement Squeeze 1025.00 1026.00 0
1998-09-13 Perforation 488.00 489.00 14
1998-09-13 Remedial Casing Cementing 488.00 489.00 0
1998-09-14 Perforation 390.00 391.00 14
1998-09-14 Perforation 375.00 376.00 14
1998-09-15 Packing Device Capped w/Cement 355.00 383.00 0
1981-03-18 Perforation 3030.00 3030.30 3
1998-09-22 Perforation 320.00 321.00 14
1998-09-23 Remedial Casing Cementing 320.00 321.00 0
1981-03-18 Perforation 3017.50 3017.80 3
1981-03-20 Perforation 2972.50 2972.80 3
1981-03-21 Perforation 2992.50 2992.50 3
1981-03-22 Perforation 3009.00 3009.30 3
1981-07-07 Perforation 3030.00 3044.00 3
1981-07-22 Fracture 3030.00 3044.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 821 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-10-09 Lost Circulation 67.00 175.00
1980-10-19 Lost Circulation 1350.00 1350.00

For data sources see[6]

References