X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355063009000

Well Details

Well ID: 0355063009000
Loading map...
Location: 00/09-30-035-06W5/0
Location Alias: 00/09-30-35-06 W5M
Location Alias 2: 00/09-30-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 30
County/Municipality: Clearwater County
Well Name: AMOCO CAROLINE 9-30-35-6
Operator Name: BP Canada Energy Group ULC
License Number: 0058945
License Date: 1976-07-02
License Status: RecCertified
Spud Date: 1976-07-05
Final Drill Date: 1976-07-28
Well Total Depth: 2712.70 m
Surface Hole Latitude: 52.037734
Surface Hole Longitude: -114.839287

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-02 Obtained License
1976-07-28 Finished Drilling
1976-07-28 Well Mode changed to Drilled and Cased
1976-08-01 Production Casing Operation Performed
1976-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-24 Perforation Treatment Performed - Jet Perforation
1976-08-25 Perforation Treatment Performed - Fractured
1976-10-20 Well Began Production
1976-10-20 Well Fluid changed to Crude Oil
1976-10-20 Well Mode changed to Pumping
1983-06-07 Perforation Treatment Performed - Jet Perforation
1983-06-07 Well Log Performed
1985-01-01 Well Fluid changed to Crude Oil
1985-01-01 Well Mode changed to Suspended
1995-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-26 Perforation Treatment Performed - Jet Perforation
1995-08-26 Plug Back Performed
1995-08-26 Well Log Performed
1995-08-30 Perforation Treatment Performed - Remedial Casing
1995-08-30 Well Fluid changed to Crude Oil
1995-08-30 Well Mode changed to Abandoned
1995-09-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-24 Perforation 2677.40 2678.60 3
1976-08-24 Perforation 2681.00 2683.50 3
1976-08-24 Acid Treatment 2677.40 2683.50 0
1976-08-25 Fracture 2677.40 2683.50 0
1983-06-07 Perforation 2677.30 2679.20 13
1983-06-07 Perforation 2681.00 2684.10 13
1995-08-26 Packing Device Capped w/Cement 2659.00 2667.00 0
1995-08-26 Perforation 600.00 601.00 10
1995-08-30 Remedial Casing Cementing 600.00 601.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 662 0.0 0.0 0.0
1977 7785 0.0 0.0 0.0
1978 7811 0.0 0.0 0.0
1979 8554 0.0 0.0 0.0
1980 8199 0.0 0.0 0.0
1981 8731 0.0 0.0 0.0
1982 8383 0.0 0.0 0.0
1983 7495 0.0 0.0 0.0
1984 6749 0.0 0.0 0.0

For data sources see[5]

References