X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355062810000

Well Details

Well ID: 0355062810000
Loading map...
Location: 00/10-28-035-06W5/0
Location Alias: 00/10-28-35-06 W5M
Location Alias 2: 00/10-28-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 28
County/Municipality: Clearwater County
Well Name: PWEI CAROLINE 10-28-35-6
Operator Name: TAQA North Ltd.
License Number: 0055112
License Date: 1975-09-25
License Status: RecCertified
Spud Date: 1975-10-01
Final Drill Date: 1975-10-21
Well Total Depth: 2664.00 m
Surface Hole Latitude: 52.037695
Surface Hole Longitude: -114.794381

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-25 Obtained License
1975-10-01 Lost Circulation Occurred
1975-10-09 Lost Circulation Occurred
1975-10-21 Finished Drilling
1975-10-21 Well Mode changed to Drilled and Cased
1975-10-22 Production Casing Operation Performed
1975-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-11 Perforation Treatment Performed - Jet Perforation
1975-11-12 Perforation Treatment Performed - Fractured
1975-11-28 Well Began Production
1975-11-28 Well Fluid changed to Crude Oil
1975-11-28 Well Mode changed to Pumping
1995-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-24 Perforation Treatment Performed - Jet Perforation
1995-07-24 Plug Back Performed
1995-07-24 Well Log Performed
1995-08-28 Perforation Treatment Performed - Remedial Casing
1995-08-28 Well Fluid changed to Crude Oil
1995-08-28 Well Mode changed to Abandoned
1995-09-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-11 Perforation 2628.90 2629.50 3
1975-11-11 Perforation 2630.10 2630.70 3
1975-11-11 Perforation 2631.60 2632.60 3
1975-11-11 Acid Treatment 2628.90 2632.60 0
1975-11-12 Fracture 2628.90 2632.60 0
1995-07-24 Packing Device Capped w/Cement 2607.00 2615.00 0
1995-07-24 Perforation 600.00 601.00 10
1995-08-28 Remedial Casing Cementing 600.00 601.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 792 0.0 0.0 0.0
1976 8299 0.0 0.0 0.0
1977 7920 0.0 0.0 0.0
1978 7921 0.0 0.0 0.0
1979 8516 0.0 0.0 0.0
1980 8234 0.0 0.0 0.0
1981 7361 0.0 0.0 0.0
1982 8686 0.0 0.0 0.0
1983 8401 0.0 0.0 0.0
1984 8759 0.0 0.0 0.0
1985 7889 0.0 0.0 0.0
1986 8443 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 7676 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8244 0.0 0.0 0.0
1991 8204 0.0 0.0 0.0
1992 2568 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-10-01 Lost Circulation 76.20 119.00
1975-10-09 Lost Circulation 1851.70 1875.70

For data sources see[6]

References