X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355062006000

Well Details

Well ID: 0355062006000
Loading map...
Location: 00/06-20-035-06W5/0
Location Alias: 00/06-20-35-06 W5M
Location Alias 2: 00/06-20-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 20
County/Municipality: Clearwater County
Well Name: PWEI CAROLINE 6-20-35-6
Operator Name: TAQA North Ltd.
License Number: 0071077
License Date: 1978-08-02
License Status: RecCertified
Spud Date: 1978-08-07
Final Drill Date: 1978-10-11
Well Total Depth: 2750.00 m
Surface Hole Latitude: 52.017820
Surface Hole Longitude: -114.830772

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-02 Obtained License
1978-10-11 Finished Drilling
1978-11-07 Production Casing Operation Performed
1978-11-09 Well Mode changed to Drilled and Cased
1978-12-14 Perforation Treatment Performed - Jet Perforation
1978-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-19 Perforation Treatment Performed - Fractured
1979-02-04 Perforation Treatment Performed - Fractured
1980-03-18 Well Began Production
1980-03-18 Well Fluid changed to Crude Oil
1980-03-18 Well Mode changed to Pumping
1995-10-01 Well Fluid changed to Crude Oil
1995-10-01 Well Mode changed to Suspended
1995-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-19 Perforation Treatment Performed - Jet Perforation
1995-10-19 Plug Back Performed
1995-10-19 Well Fluid changed to Crude Oil
1995-10-19 Well Log Performed
1995-10-19 Well Mode changed to Abandoned Zone
1995-10-21 Perforation Treatment Performed - Remedial Casing
1995-11-09 Well Abandoned
1995-11-09 Well Fluid changed to Crude Oil
1995-11-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-14 Perforation 2729.00 2733.00 7
1978-12-14 Perforation 2723.00 2724.00 7
1978-12-15 Acid Treatment 2723.00 2733.00 0
1978-12-19 Fracture 2723.00 2733.00 0
1979-02-04 Fracture 2723.00 2733.00 0
1995-10-19 Packing Device Capped w/Cement 2632.00 2640.00 0
1995-10-19 Perforation 600.00 601.00 10
1995-10-21 Remedial Casing Cementing 600.00 601.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1239 0.0 0.0 0.0
1980 3998 0.0 0.0 0.0
1981 3465 0.0 0.0 0.0
1982 5716 0.0 0.0 0.0
1983 5454 0.0 0.0 0.0
1984 5926 0.0 0.0 0.0
1985 4592 0.0 0.0 0.0
1986 4530 0.0 0.0 0.0
1987 7790 0.0 0.0 0.0
1988 8331 0.0 0.0 0.0
1989 7832 0.0 0.0 0.0
1990 6313 0.0 0.0 0.0
1991 7580 0.0 0.0 0.0
1992 8579 0.0 0.0 0.0
1993 1824 0.0 0.0 0.0
1994 960 0.0 0.0 0.0
1995 792 0.0 0.0 0.0

For data sources see[5]

References