X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355061116000

Well Details

Well ID: 0355061116000
Loading map...
Location: 00/16-11-035-06W5/0
Location Alias: 00/16-11-35-06 W5M
Location Alias 2: 00/16-11-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 11
County/Municipality: Clearwater County
Well Name: ALTANA CAROLINE 16-11-35-6
Operator Name: TAQA North Ltd.
License Number: 0046928
License Date: 1973-08-17
License Status: Abandoned
Spud Date: 1973-09-20
Final Drill Date: 1973-10-11
Well Total Depth: 2641.10 m
Surface Hole Latitude: 51.996168
Surface Hole Longitude: -114.743251

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-08-17 Obtained License
1973-10-11 Finished Drilling
1973-10-11 Well Mode changed to Drilled and Cased
1973-10-13 Production Casing Operation Performed
1973-11-01 Perforation Treatment Performed - Jet Perforation
1973-11-16 Perforation Treatment Performed - Fractured
1973-12-14 Well Began Production
1973-12-14 Well Fluid changed to Crude Oil
1973-12-14 Well Mode changed to Pumping
1974-06-08 Perforation Treatment Performed - Fractured
1974-06-10 Perforation Treatment Performed - Cement Squeeze
1974-06-13 Perforation Treatment Performed - Cement Squeeze
1974-06-15 Perforation Treatment Performed - Cement Squeeze
1974-06-16 Perforation Treatment Performed - Fractured
1982-03-31 Well Fluid changed to Crude Oil
1982-03-31 Well Mode changed to Suspended
1987-09-03 Perforation Treatment Performed - Jet Perforation
1987-09-03 Well Log Performed
1987-10-27 Well Fluid changed to Crude Oil
1987-10-27 Well Mode changed to Pumping
1998-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-30 Perforation Treatment Performed - Jet Perforation
1998-07-30 Plug Back Performed
1998-07-30 Well Fluid changed to Crude Oil
1998-07-30 Well Log Performed
1998-07-30 Well Mode changed to Abandoned Zone
1998-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-31 Perforation Treatment Performed - Remedial Casing
1998-08-11 Well Abandoned
1998-08-11 Well Fluid changed to Crude Oil
1998-08-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-11-01 Perforation 2618.20 2620.40 13
1987-09-03 Perforation 2617.50 2618.50 14
1998-07-30 Packing Device Capped w/Cement 2595.00 2603.00 0
1998-07-30 Perforation 600.00 601.00 13
1998-07-31 Remedial Casing Cementing 600.00 601.00 0
1998-07-31 Packing Device Capped w/Cement 515.00 592.00 0
1973-11-01 Perforation 2612.40 2613.70 13
1973-11-16 Fracture 2612.40 2620.40 0
1974-06-08 Fracture 2612.40 2620.40 0
1974-06-10 Cement Squeeze 1180.50 1180.50 0
1974-06-13 Cement Squeeze 1180.50 1180.50 0
1974-06-15 Cement Squeeze 1180.50 1180.50 0
1974-06-16 Fracture 2612.40 2620.40 0
1987-09-03 Perforation 2612.00 2614.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 408 0.0 0.0 0.0
1974 6493 0.0 0.0 0.0
1975 7019 0.0 0.0 0.0
1976 8098 0.0 0.0 0.0
1977 7976 0.0 0.0 0.0
1978 2900 0.0 0.0 0.0
1979 552 0.0 0.0 0.0
1980 2481 0.0 0.0 0.0
1981 4710 0.0 0.0 0.0
1982 1584 0.0 0.0 0.0
1987 1448 0.0 0.0 0.0
1988 8423 0.0 0.0 0.0
1989 5885 0.0 0.0 0.0
1990 1056 0.0 0.0 0.0
1991 912 0.0 0.0 0.0

For data sources see[5]

References