X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355060205022

Well Details

Well ID: 0355060205022
Loading map...
Location: 02/05-02-035-06W5/2
Location Alias: 02/05-02-35-06 W5M
Location Alias 2: 02/05-02-035-06 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 02
County/Municipality: Clearwater County
Well Name: ALTANA CAROLINE 5-2-35-6
Operator Name: TAQA North Ltd.
License Number: 0037579
License Date: 1970-01-12
License Status: RecCertified
Spud Date: 1970-01-03
Final Drill Date: 1970-03-12
Well Total Depth: 4033.10 m
Surface Hole Latitude: 51.974170
Surface Hole Longitude: -114.761470

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-12 Obtained License
1970-02-24 Drill Stem Test Performed
1970-02-27 Drill Stem Test Performed
1970-03-12 Finished Drilling
1970-03-12 Well Mode changed to Drilled and Cased
1970-03-15 Drill Stem Test Performed
1970-03-16 Drill Stem Test Performed
1970-03-18 Well Log Performed
1970-03-20 Production Casing Operation Performed
1970-06-13 Perforation Treatment Performed - Jet Perforation
1970-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-28 Perforation Treatment Performed - Jet Perforation
1976-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-29 Perforation Treatment Performed - Fractured
1976-03-25 Well Began Production
1976-03-25 Well Fluid changed to Crude Oil
1976-03-25 Well Mode changed to Pumping
1986-04-08 Well Fluid changed to Crude Oil
1986-04-08 Well Mode changed to Suspended
1991-12-07 Well Fluid changed to Crude Oil
1991-12-07 Well Mode changed to Pumping
1995-10-21 Perforation Treatment Performed - Cement Plug
1995-10-21 Perforation Treatment Performed - Cement Squeeze
1995-10-21 Plug Back Performed
1995-10-21 Well Fluid changed to Crude Oil
1995-10-21 Well Mode changed to Abandoned
1995-10-23 Perforation Treatment Performed - Cement Plug
1995-10-24 Perforation Treatment Performed - Jet Perforation
1995-10-24 Perforation Treatment Performed - Remedial Casing
1995-10-24 Well Log Performed
1996-05-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-06-13 Perforation 2931.90 2934.90 7
1995-10-24 Remedial Casing Cementing 600.00 600.50 0
1970-06-19 Acid Treatment 2931.90 2934.90 0
1976-02-28 Perforation 2649.90 2653.60 13
1976-02-29 Acid Treatment 2649.90 2653.60 0
1976-02-29 Fracture 2649.90 2653.60 0
1995-10-21 Cement Squeeze 2649.90 2653.60 0
1995-10-21 Cement Plug 2510.00 2653.60 0
1995-10-23 Cement Plug 1321.40 1640.00 0
1995-10-24 Perforation 600.00 600.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5575 0.0 0.0 0.0
1977 8296 0.0 0.0 0.0
1978 8312 0.0 0.0 0.0
1979 4008 0.0 0.0 0.0
1980 7235 0.0 0.0 0.0
1981 216 0.0 0.0 0.0
1982 1827 0.0 0.0 0.0
1983 6134 0.0 0.0 0.0
1984 5406 0.0 0.0 0.0
1985 4685 0.0 0.0 0.0
1986 992 0.0 0.0 0.0
1991 250 0.0 0.0 0.0
1992 918 0.0 0.0 0.0

For data sources see[5]

References