X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355060111000

Well Details

Well ID: 0355060111000
Loading map...
Location: 00/11-01-035-06W5/0
Location Alias: 00/11-01-35-06 W5M
Location Alias 2: 00/11-01-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 01
County/Municipality: Clearwater County
Well Name: PWEI CAROL 11-1-35-6
Operator Name: TAQA North Ltd.
License Number: 0046816
License Date: 1973-08-07
License Status: RecCertified
Spud Date: 1973-08-22
Final Drill Date: 1973-09-07
Well Total Depth: 2657.90 m
Surface Hole Latitude: 51.980063
Surface Hole Longitude: -114.732995

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-08-07 Obtained License
1973-09-07 Finished Drilling
1973-09-07 Well Mode changed to Drilled and Cased
1973-09-10 Surface Casing Operation Performed
1973-09-21 Perforation Treatment Performed - Jet Perforation
1973-09-22 Perforation Treatment Performed - Fractured
1973-11-08 Well Began Production
1973-11-08 Well Fluid changed to Crude Oil
1973-11-08 Well Mode changed to Pumping
1982-05-26 Perforation Treatment Performed - Fractured
1982-12-31 Well Fluid changed to Crude Oil
1982-12-31 Well Mode changed to Suspended
1986-11-22 Well Fluid changed to Crude Oil
1986-11-22 Well Mode changed to Pumping
2001-06-01 Well Fluid changed to Crude Oil
2001-06-01 Well Mode changed to Suspended
2004-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-09 Plug Back Performed
2004-11-09 Well Fluid changed to Crude Oil
2004-11-09 Well Mode changed to Abandoned Zone
2004-11-11 Perforation Treatment Performed - Jet Perforation
2004-11-11 Perforation Treatment Performed - Remedial Casing
2004-11-12 Perforation Treatment Performed - Jet Perforation
2004-11-12 Perforation Treatment Performed - Remedial Casing
2004-11-13 Perforation Treatment Performed - Remedial Casing
2010-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-15 Perforation Treatment Performed - Jet Perforation
2010-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-16 Perforation Treatment Performed - Cement Squeeze
2010-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-17 Perforation Treatment Performed - Jet Perforation
2010-05-18 Perforation Treatment Performed - Jet Perforation
2010-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-19 Perforation Treatment Performed - Cement Squeeze
2010-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-20 Perforation Treatment Performed - Cement Squeeze
2010-05-26 Perforation Treatment Performed - Jet Perforation
2010-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-27 Perforation Treatment Performed - Cement Squeeze
2010-05-27 Perforation Treatment Performed - Jet Perforation
2010-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-03 Perforation Treatment Performed - Cement Squeeze
2010-07-12 Well Abandoned
2010-07-12 Well Fluid changed to Crude Oil
2010-07-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-21 Perforation 2610.00 2611.80 13
2004-11-12 Perforation 435.00 436.00 17
2004-11-13 Remedial Casing Cementing 435.00 436.00 0
2010-05-15 Packing Device Capped w/Cement 1661.00 1665.00 0
2010-05-15 Perforation 1660.00 1661.00 17
2010-05-15 Perforation 1495.00 1496.00 17
2010-05-16 Cement Squeeze 1660.00 1661.00 0
2010-05-16 Packing Device Capped w/Cement 1646.00 1654.00 0
2010-05-17 Packing Device Capped w/Cement 1482.00 1490.00 0
2010-05-17 Perforation 1470.00 1471.00 17
2010-05-17 Perforation 1070.00 1071.00 17
1973-09-21 Perforation 2606.60 2607.90 13
2010-05-18 Perforation 1270.00 1271.00 17
2010-05-19 Cement Squeeze 1470.00 1471.00 0
2010-05-19 Packing Device Capped w/Cement 1455.00 1465.00 0
2010-05-20 Packing Device Capped w/Cement 1271.00 1276.00 0
2010-05-20 Cement Squeeze 1270.00 1271.00 0
2010-05-20 Packing Device Capped w/Cement 1258.00 1266.00 0
2010-05-26 Perforation 1225.00 1226.00 17
2010-05-27 Cement Squeeze 1225.00 1226.00 0
2010-05-27 Packing Device Capped w/Cement 1213.00 1221.00 0
2010-05-27 Perforation 290.00 291.00 17
1973-09-22 Fracture 2606.60 2611.80 0
2010-06-03 Cement Squeeze 290.00 291.00 0
2010-06-03 Packing Device Capped w/Cement 278.00 286.00 0
1982-05-26 Fracture 2606.60 2611.80 0
2004-11-09 Packing Device Capped w/Cement 2592.00 2600.00 0
2004-11-11 Perforation 1910.00 1911.00 17
2004-11-11 Remedial Casing Cementing 1910.00 1911.00 0
2004-11-12 Perforation 929.00 930.00 17
2004-11-12 Remedial Casing Cementing 929.00 930.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 616 0.0 0.0 0.0
1974 5620 0.0 0.0 0.0
1975 5670 0.0 0.0 0.0
1976 7006 0.0 0.0 0.0
1977 7128 0.0 0.0 0.0
1978 6978 0.0 0.0 0.0
1979 6407 0.0 0.0 0.0
1980 7230 0.0 0.0 0.0
1981 1580 0.0 0.0 0.0
1982 5574 0.0 0.0 0.0
1986 944 0.0 0.0 0.0
1987 6235 0.0 0.0 0.0
1988 4588 0.0 0.0 0.0
1989 4904 0.0 0.0 0.0
1990 4680 0.0 0.0 0.0
1991 4674 0.0 0.0 0.0
1992 4092 0.0 0.0 0.0
1993 4064 0.0 0.0 0.0
1994 3680 0.0 0.0 0.0
1995 8222 0.0 0.0 0.0

For data sources see[5]

References