X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355052205002

Well Details

Well ID: 0355052205002
Loading map...
Location: 00/05-22-035-05W5/2
Location Alias: 00/05-22-35-05 W5M
Location Alias 2: 00/05-22-035-05 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 22
County/Municipality: Clearwater County
Well Name: PWEI CAROL 5-22-35-5
Operator Name: TAQA North Ltd.
License Number: 0081477
License Date: 1980-03-04
License Status: Suspension
Spud Date: 1980-03-26
Final Drill Date: 1980-04-25
Well Total Depth: 2798.00 m
Surface Hole Latitude: 52.017752
Surface Hole Longitude: -114.638855

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-04 Obtained License
1980-04-25 Finished Drilling
1980-04-25 Well Mode changed to Drilled and Cased
1980-04-28 Production Casing Operation Performed
1980-07-26 Perforation Treatment Performed - Jet Perforation
1980-07-28 Perforation Treatment Performed - Fractured
1980-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-16 Perforation Treatment Performed - Jet Perforation
1980-11-20 Perforation Treatment Performed - Fractured
1982-09-24 Well Began Production
1982-09-24 Well Fluid changed to Gas
1982-09-24 Well Mode changed to Flowing
1992-02-29 Well Fluid changed to Gas
1992-02-29 Well Mode changed to Suspended
1995-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-18 Plug Back Performed
1995-01-18 Well Fluid changed to Gas
1995-01-18 Well Mode changed to Abandoned Zone
1995-01-20 Well Log Performed
1995-01-21 Perforation Treatment Performed - Jet Perforation
1995-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-06 Plug Back Performed
2008-12-06 Well Log Performed
2015-05-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-26 Perforation 2721.00 2728.00 4
1995-01-22 Acid Treatment 2465.50 2467.50 0
2008-12-06 Packing Device Capped w/Cement 2452.00 2460.00 0
1980-07-28 Fracture 2721.00 2728.00 0
1980-09-10 Acid Treatment 2721.00 2728.00 0
1980-11-16 Perforation 2697.50 2698.50 4
1980-11-16 Perforation 2690.00 2692.00 4
1980-11-16 Perforation 2681.00 2683.00 4
1980-11-20 Fracture 2681.00 2698.50 0
1995-01-18 Packing Device Capped w/Cement 2647.00 2655.00 0
1995-01-21 Perforation 2465.50 2467.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2177 0.0 0.0 0.0
1983 3159 0.0 0.0 0.0
1984 3054 0.0 0.0 0.0
1985 3717 0.0 0.0 0.0
1986 3785 0.0 0.0 0.0
1987 2998 0.0 0.0 0.0
1988 3116 0.0 0.0 0.0
1989 309 0.0 0.0 0.0

For data sources see[5]

References