X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355050612002

Well Details

Well ID: 0355050612002
Loading map...
Location: 00/12-06-035-05W5/2
Location Alias: 00/12-06-35-05 W5M
Location Alias 2: 00/12-06-035-05 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 06
County/Municipality: Clearwater County
Well Name: ALTANA CAROLINE 12-6-35-5
Operator Name: TAQA North Ltd.
License Number: 0053893
License Date: 1975-06-17
License Status: RecCertified
Spud Date: 1975-07-14
Final Drill Date: 1975-08-02
Well Total Depth: 2590.80 m
Surface Hole Latitude: 51.979631
Surface Hole Longitude: -114.711599

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-17 Obtained License
1975-07-25 Drill Stem Test Performed
1975-08-02 Finished Drilling
1975-08-02 Well Mode changed to Drilled and Cased
1975-08-03 Well Log Performed
1975-08-05 Well Log Performed
1975-08-06 Production Casing Operation Performed
1975-08-22 Perforation Treatment Performed - Jet Perforation
1976-02-16 Perforation Treatment Performed - Jet Perforation
1976-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-17 Perforation Treatment Performed - Fractured
1976-03-05 Well Began Production
1976-03-05 Well Fluid changed to Crude Oil
1976-03-05 Well Mode changed to Pumping
1987-09-15 Perforation Treatment Performed - Jet Perforation
1987-09-15 Well Log Performed
1995-10-31 Well Log Performed
1995-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-02 Perforation Treatment Performed - Jet Perforation
1995-11-02 Plug Back Performed
1995-11-02 Well Log Performed
1995-11-03 Perforation Treatment Performed - Remedial Casing
1996-05-23 Well Abandoned
1996-05-23 Well Fluid changed to Crude Oil
1996-05-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-22 Perforation 2043.10 2043.70 13
1987-09-15 Perforation 2564.60 2565.60 12
1987-09-15 Perforation 2043.00 2046.00 12
1987-09-15 Perforation 2564.60 2565.60 12
1987-09-15 Perforation 2569.50 2573.30 12
1995-11-02 Packing Device Capped w/Cement 2547.00 2555.00 0
1995-11-02 Packing Device Capped w/Cement 2023.00 2031.00 0
1995-11-02 Perforation 600.00 605.00 13
1995-11-03 Remedial Casing Cementing 600.00 605.00 0
1975-08-22 Perforation 2045.80 2048.30 13
1976-02-16 Perforation 2564.60 2565.50 13
1976-02-16 Perforation 2569.80 2574.00 13
1976-02-17 Acid Treatment 2564.60 2574.00 0
1976-02-17 Fracture 2564.60 2574.00 0
1987-09-15 Perforation 2043.00 2046.00 6
1987-09-15 Perforation 2048.50 2049.50 12
1987-09-15 Perforation 2051.80 2052.80 12

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4958 0.0 0.0 0.0
1977 7132 0.0 0.0 0.0
1978 6065 0.0 0.0 0.0
1979 3543 0.0 0.0 0.0
1980 2863 0.0 0.0 0.0
1981 356 0.0 0.0 0.0
1982 3589 0.0 0.0 0.0
1983 428 0.0 0.0 0.0
1984 5323 0.0 0.0 0.0
1985 7062 0.0 0.0 0.0
1986 6896 0.0 0.0 0.0
1987 5248 0.0 0.0 0.0
1988 6643 0.0 0.0 0.0
1989 6887 0.0 0.0 0.0
1990 8263 0.0 0.0 0.0
1991 6530 0.0 0.0 0.0
1992 6746 0.0 0.0 0.0

For data sources see[5]

References