X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355042809000

Well Details

Well ID: 0355042809000
Loading map...
Location: 00/09-28-035-04W5/0
Location Alias: 00/09-28-35-04 W5M
Location Alias 2: 00/09-28-035-04 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 04
Section: 28
County/Municipality: Clearwater County
Well Name: GPI GARR 9-28-35-4
Operator Name: Harvest Operations Corp.
License Number: 0375078
License Date: 2007-02-26
License Status: Abandoned
Spud Date: 2007-03-06
Final Drill Date: 2007-03-13
Well Total Depth: 2605.00 m
Surface Hole Latitude: 52.037297
Surface Hole Longitude: -114.506062

For data sources see[1][2]

Well History

Date Event
2007-02-26 Obtained License
2007-03-07 Surface Casing Operation Performed
2007-03-13 Finished Drilling
2007-03-13 Well Log Performed
2007-03-13 Well Mode changed to Drilled and Cased
2007-03-14 Well Log Performed
2007-03-15 Production Casing Operation Performed
2007-03-15 Rig Released
2007-07-26 Well Log Performed
2007-07-27 Perforation Treatment Performed - Jet Perforation
2007-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-08-02 Well Log Performed
2007-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-12 Perforation Treatment Performed - Jet Perforation
2007-10-12 Plug Back Performed
2007-10-12 Well Log Performed
2007-10-12 Well Mode changed to Abandoned Zone
2007-10-13 Well Log Performed
2007-10-15 Perforation Treatment Performed - Fractured
2009-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-05 Plug Back Performed
2009-06-05 Well Log Performed
2009-06-07 Well Log Performed
2009-06-10 Perforation Treatment Performed - Jet Perforation
2009-06-10 Perforation Treatment Performed - Remedial Casing
2009-06-10 Well Log Performed
2009-06-23 Well Log Performed
2009-10-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-27 Perforation 2499.00 2503.00 20
2007-10-15 Fracture 2454.00 2456.00 0
2009-06-05 Packing Device Capped w/Cement 2441.00 2449.00 0
2009-06-10 Perforation 1053.10 1053.80 99
2009-06-10 Remedial Casing Cementing 1053.10 1053.80 0
2007-07-27 Perforation 2504.00 2505.50 20
2007-07-27 Perforation 2510.00 2511.50 20
2007-07-31 Acid Treatment 2510.00 2511.50 0
2007-07-31 Acid Treatment 2504.00 2506.00 0
2007-07-31 Acid Treatment 2501.00 2503.00 0
2007-07-31 Acid Treatment 2499.00 2501.00 0
2007-10-12 Packing Device Capped w/Cement 2487.00 2495.00 0
2007-10-12 Perforation 2454.00 2456.00 17

For data sources see[4]



References