X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355041013000

Well Details

Well ID: 0355041013000
Loading map...
Location: 00/13-10-035-04W5/0
Location Alias: 00/13-10-35-04 W5M
Location Alias 2: 00/13-10-035-04 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 04
Section: 10
County/Municipality: Red Deer County
Well Name: NAL GARR 13-10-35-4
Operator Name: NAL Resources Limited
License Number: 0433623
License Date: 2011-05-18
License Status: Issued
Spud Date: 2011-06-24
Final Drill Date: 2011-07-13
Well Total Depth: 3400.00 m
Surface Hole Latitude: 51.985096
Surface Hole Longitude: -114.497679

For data sources see[1][2]

Well History

Date Event
2011-05-18 Obtained License
2011-06-26 Surface Casing Operation Performed
2011-06-29 Direction Drilling Operation Performed - Horizontal
2011-07-06 Well Log Performed
2011-07-08 Intermediate Casing Operation Performed
2011-07-13 Finished Drilling
2011-07-13 Well Log Performed
2011-07-13 Well Mode changed to Drilled and Cased
2011-07-15 Liner Casing Operation Performed
2011-07-16 Rig Released
2011-08-15 Well Log Performed
2011-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-20 Well Began Production
2011-10-20 Well Fluid changed to Crude Oil
2011-10-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-29 1774.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-04 Multi-Stage Fracture 3385.20 3385.30 0
2011-09-05 Multi-Stage Fracture 2754.20 2754.30 0
2011-09-05 Multi-Stage Fracture 2681.20 2681.30 0
2011-09-05 Multi-Stage Fracture 2620.90 2621.00 0
2011-09-05 Multi-Stage Fracture 2546.40 2546.50 0
2011-09-05 Multi-Stage Fracture 2471.40 2471.50 0
2011-09-05 Multi-Stage Fracture 2410.80 2410.90 0
2011-09-05 Multi-Stage Fracture 2338.90 2339.00 0
2011-09-05 Multi-Stage Fracture 2264.10 2264.20 0
2011-09-05 Multi-Stage Fracture 2203.70 2203.80 0
2011-09-04 Multi-Stage Fracture 3323.10 3323.40 0
2011-09-04 Multi-Stage Fracture 3247.30 3247.40 0
2011-09-04 Multi-Stage Fracture 3172.80 3172.90 0
2011-09-05 Multi-Stage Fracture 3112.00 3112.10 0
2011-09-05 Multi-Stage Fracture 3037.60 3037.70 0
2011-09-05 Multi-Stage Fracture 2963.10 2963.20 0
2011-09-05 Multi-Stage Fracture 2902.80 2902.90 0
2011-09-05 Multi-Stage Fracture 2828.90 2829.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1692 0.0 0.0 0.0
2012 8502 0.0 0.0 0.0
2013 8714 0.0 0.0 0.0
2014 8313 0.0 0.0 0.0
2015 8682 0.0 0.0 0.0
2016 8493 0.0 0.0 0.0
2017 8729 0.0 0.0 0.0
2018 8398 0.0 0.0 0.0
2019 8408 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[6]

References