X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355031708003

Well Details

Well ID: 0355031708003
Loading map...
Location: 00/08-17-035-03W5/3
Location Alias: 00/08-17-35-03 W5M
Location Alias 2: 00/08-17-035-03 W5/03
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 03
Section: 17
County/Municipality: Red Deer County
Well Name: WHITECAP GARR 8-17-35-3
Operator Name: Whitecap Resources Inc.
License Number: 0102258
License Date: 1983-07-18
License Status: RecCertified
Spud Date: 1983-07-19
Final Drill Date: 1983-08-16
Well Total Depth: 2174.00 m
Surface Hole Latitude: 52.003099
Surface Hole Longitude: -114.380017

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-18 Obtained License
1983-07-19 Direction Drilling Operation Performed - 98
1983-07-27 Well Log Performed
1983-08-12 Kick Occurred
1983-08-16 Finished Drilling
1983-08-16 Well Mode changed to Drilled and Cased
1983-08-18 Production Casing Operation Performed
1983-09-01 Perforation Treatment Performed - Jet Perforation
1983-09-02 Perforation Treatment Performed - Fractured
1983-10-05 Perforation Treatment Performed - Chemical Squeeze
1983-11-11 Perforation Treatment Performed - Fractured
1984-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-19 Perforation Treatment Performed - Jet Perforation
1984-03-21 Perforation Treatment Performed - Fractured
1984-11-10 Perforation Treatment Performed - Jet Perforation
1990-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-21 Perforation Treatment Performed - Cement Squeeze
1990-09-23 Well Log Performed
1990-09-24 Perforation Treatment Performed - Jet Perforation
1990-09-25 Perforation Treatment Performed - Jet Perforation
1990-09-26 Perforation Treatment Performed - Jet Perforation
1990-10-16 Well Began Production
1990-10-16 Well Fluid changed to Crude Oil
1990-10-16 Well Mode changed to Pumping
1991-09-30 Well Fluid changed to Crude Oil
1991-09-30 Well Mode changed to Suspended
1995-08-03 Well Fluid changed to Crude Oil
1995-08-03 Well Mode changed to Flowing
1998-07-01 Well Fluid changed to Crude Oil
1998-07-01 Well Mode changed to Suspended
2000-06-27 Well Fluid changed to Crude Oil
2000-06-27 Well Mode changed to Pumping
2004-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-19 Plug Back Performed
2004-06-19 Well Fluid changed to Crude Oil
2004-06-19 Well Mode changed to Abandoned Zone
2004-06-20 Perforation Treatment Performed - Jet Perforation
2004-06-20 Perforation Treatment Performed - Remedial Casing
2004-06-22 Perforation Treatment Performed - Jet Perforation
2004-06-22 Perforation Treatment Performed - Remedial Casing
2004-06-23 Well Abandoned
2004-06-23 Well Fluid changed to Crude Oil
2004-06-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-07-19 240.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-01 Perforation 2139.00 2153.00 13
1990-09-21 Cement Squeeze 1867.00 1875.00 0
1990-09-24 Perforation 2077.20 2086.00 13
1990-09-25 Perforation 1993.00 2016.00 13
1990-09-25 Perforation 2020.00 2040.00 13
1990-09-25 Perforation 2062.00 2068.40 13
1990-09-26 Perforation 1993.00 2016.00 13
1990-09-26 Perforation 2020.00 2030.00 13
2004-06-19 Packing Device Capped w/Cement 1977.00 1985.00 0
2004-06-20 Perforation 514.50 515.50 35
2004-06-20 Remedial Casing Cementing 514.50 515.50 0
1983-09-02 Fracture 2139.00 2153.00 0
2004-06-22 Perforation 235.00 236.00 35
2004-06-22 Remedial Casing Cementing 235.00 236.00 0
1983-10-05 Chemical Squeeze 2139.00 2153.00 0
1983-11-11 Fracture 2139.00 2153.00 0
1984-03-19 Packing Device Capped w/Cement 2095.00 2103.00 0
1984-03-19 Perforation 1867.00 1875.00 13
1984-03-21 Fracture 1867.00 1875.00 0
1984-11-10 Perforation 2139.00 2153.00 0
1990-09-20 Packing Device Capped w/Cement 2125.00 2133.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 643 0.0 0.0 0.0
1991 1509 0.0 0.0 0.0
1995 2784 0.0 0.0 0.0
1996 2652 0.0 0.0 0.0
1997 306 0.0 0.0 0.0
1998 330 0.0 0.0 0.0
2000 1248 0.0 0.0 0.0
2001 2348 0.0 0.0 0.0
2002 1128 0.0 0.0 0.0
2003 1224 0.0 0.0 0.0
2004 504 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-08-12 Kick 2078.00 2078.00

For data sources see[7]

References