X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355021210000

Well Details

Well ID: 0355021210000
Loading map...
Location: 00/10-12-035-02W5/0
Location Alias: 00/10-12-35-02 W5M
Location Alias 2: 00/10-12-035-02 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 02
Section: 12
County/Municipality: Red Deer County
Well Name: FLAGSTONE INNIS 10-12-35-2
Operator Name: Surge Energy Inc.
License Number: 0279337
License Date: 2002-12-23
License Status: Suspension
Spud Date: 2002-12-27
Final Drill Date: 2003-01-15
Well Total Depth: 2325.00 m
Surface Hole Latitude: 51.998366
Surface Hole Longitude: -114.149146

For data sources see[1][2]

Well History

Date Event
2002-12-23 Obtained License
2002-12-28 Direction Drilling Operation Performed - Deviate
2002-12-30 Surface Casing Operation Performed
2003-01-15 Finished Drilling
2003-01-15 Well Log Performed
2003-01-15 Well Mode changed to Drilled and Cased
2003-01-16 Well Log Performed
2003-01-17 Production Casing Operation Performed
2003-01-18 Rig Released
2003-02-07 Well Log Performed
2003-02-09 Perforation Treatment Performed - Jet Perforation
2003-02-09 Well Log Performed
2003-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-16 Perforation Treatment Performed - Fractured
2003-07-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-07-05 Perforation Treatment Performed - Jet Perforation
2003-07-06 Perforation Treatment Performed - Cement Squeeze
2003-07-13 Perforation Treatment Performed - Cement Squeeze
2003-07-13 Perforation Treatment Performed - Jet Perforation
2003-07-15 Perforation Treatment Performed - Chemical Squeeze
2003-07-18 Perforation Treatment Performed - Fractured
2003-08-18 Well Began Production
2003-08-18 Well Fluid changed to Crude Oil
2003-08-18 Well Mode changed to Pumping
2004-03-01 Well Fluid changed to Crude Oil
2004-03-01 Well Mode changed to Suspended
2004-06-09 Well Fluid changed to Crude Oil
2004-06-09 Well Mode changed to Pumping
2012-04-01 Well Fluid changed to Crude Oil
2012-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-12-28 1447.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-09 Perforation 2287.00 2311.00 20
2003-07-15 Chemical Squeeze 1273.00 1282.00 0
2003-07-18 Fracture 1273.00 1282.00 0
2003-02-11 Acid Treatment 2287.00 2311.00 0
2003-02-16 Fracture 2287.00 2311.00 0
2003-07-05 Bridge Plug, No Cement 2283.00 2284.00 0
2003-07-05 Perforation 1293.50 1293.80 4
2003-07-05 Perforation 1199.70 1200.00 4
2003-07-06 Cement Squeeze 1293.50 1293.80 0
2003-07-13 Cement Squeeze 1199.70 1200.00 0
2003-07-13 Perforation 1273.00 1282.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1810 0.0 0.0 0.0
2004 1248 0.0 0.0 0.0
2005 4488 0.0 0.0 0.0
2006 5707 0.0 0.0 0.0
2007 4271 0.0 0.0 0.0

For data sources see[6]

References