0355011501000

Well Details

Well ID: 0355011501000
Loading map...
Location: 00/01-15-035-01W5/0
Location Alias: 00/01-15-35-01 W5M
Location Alias 2: 00/01-15-035-01 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 01
Section: 15
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 1-15-35-1
Operator Name: Enhance Energy Inc.
License Number: 0015584
License Date: 1958-07-16
License Status: Amended
Spud Date: 1958-07-19
Final Drill Date: 1958-08-20
Well Total Depth: 2635.00 m
Surface Hole Latitude: 52.000833
Surface Hole Longitude: -114.052350

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-07-16 Obtained License
1958-08-18 Production Casing Operation Performed
1958-08-20 Finished Drilling
1958-08-20 Perforation Treatment Performed - Open-Hole Completion
1958-08-20 Well Mode changed to Drilled and Cased
1958-08-24 Well Began Production
1958-08-24 Well Fluid changed to Crude Oil
1958-08-24 Well Mode changed to Flowing
1961-07-15 Perforation Treatment Performed - Open-Hole Completion
1977-07-27 Well Log Performed
1979-05-23 Well Log Performed
1984-04-23 Well Log Performed
1984-04-24 Well Log Performed
1984-05-01 Well Log Performed
1984-05-03 Well Log Performed
1984-05-08 Well Log Performed
1984-09-10 Perforation Treatment Performed - Jet Perforation
1984-09-10 Well Log Performed
1984-09-11 Well Log Performed
1984-09-12 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-04-15 Perforation Treatment Performed - Jet Perforation
1988-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-20 Perforation Treatment Performed - Cement Squeeze
1988-04-21 Perforation Treatment Performed - Jet Perforation
1988-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-23 Perforation Treatment Performed - Jet Perforation
1990-07-04 Well Fluid changed to Crude Oil
1990-07-04 Well Mode changed to Suspended
1991-08-05 Well Log Performed
1993-03-06 Well Log Performed
1993-03-28 Perforation Treatment Performed - Cement Squeeze
1993-03-31 Perforation Treatment Performed - Open-Hole Completion
1993-03-31 Well Log Performed
1994-02-01 Perforation Treatment Performed - Jet Perforation
1994-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-04 Well Fluid changed to Crude Oil
1994-02-04 Well Mode changed to Flowing
1994-05-30 Perforation Treatment Performed - Chemical Squeeze
1994-07-08 Well Fluid changed to Crude Oil
1994-07-08 Well Mode changed to Pumping
1999-10-31 Well Fluid changed to Crude Oil
1999-10-31 Well Mode changed to Suspended
2003-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-10 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-09-10 Plug Back Performed
2003-09-10 Well Fluid changed to Crude Oil
2003-09-10 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-08-20 Open Hole/Barefoot Completion 2596.00 2602.10 0
1988-04-22 Acid Treatment 2568.90 2570.70 0
1988-04-23 Perforation 2570.70 2572.20 13
1988-04-23 Acid Treatment 2568.90 2572.20 0
1993-03-28 Cement Squeeze 2568.90 2578.50 0
1993-03-31 Open Hole/Barefoot Completion 2596.00 2635.00 0
1994-02-01 Perforation 2565.20 2567.20 13
1994-02-03 Acid Treatment 2565.20 2567.20 0
1994-05-30 Chemical Squeeze 2565.20 2567.20 0
2003-09-10 Packing Device Capped w/Cement 2552.00 2560.00 0
2003-09-10 Bridge Plug, No Cement 1952.00 1960.00 0
1961-07-15 Open Hole/Barefoot Completion 2596.00 2623.40 0
1984-09-10 Perforation 2577.00 2578.50 13
1984-09-12 Acid Wash 2577.00 2578.50 0
1988-04-14 Packing Device Capped w/Cement 2575.00 2592.00 0
1988-04-15 Perforation 2565.80 2565.80 13
1988-04-18 Acid Treatment 2565.80 2565.80 0
1988-04-20 Cement Squeeze 2565.80 2565.80 0
1988-04-21 Perforation 2568.90 2570.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1984 1183 0.0 0.0 0.0
1985 3122 0.0 0.0 0.0
1986 1252 0.0 0.0 0.0
1987 4446 0.0 0.0 0.0
1988 1861 0.0 0.0 0.0
1989 720 0.0 0.0 0.0
1994 4922 0.0 0.0 0.0
1995 357 0.0 0.0 0.0

For data sources see[5]