X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355010915000

Well Details

Well ID: 0355010915000
Loading map...
Location: 00/15-09-035-01W5/0
Location Alias: 00/15-09-35-01 W5M
Location Alias 2: 00/15-09-035-01 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 01
Section: 09
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 15-9-35-1
Operator Name: Enhance Energy Inc.
License Number: 0013856
License Date: 1957-08-16
License Status: Suspension
Spud Date: 1957-08-25
Final Drill Date: 1957-10-12
Well Total Depth: 2584.10 m
Surface Hole Latitude: 51.997040
Surface Hole Longitude: -114.081547

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-08-16 Obtained License
1957-09-15 Lost Circulation Occurred
1957-10-01 Lost Circulation Occurred
1957-10-09 Lost Circulation Occurred
1957-10-10 Production Casing Operation Performed
1957-10-12 Finished Drilling
1957-10-12 Perforation Treatment Performed - Open-Hole Completion
1957-10-12 Well Mode changed to Drilled and Cased
1957-10-23 Well Began Production
1957-10-23 Well Fluid changed to Crude Oil
1957-10-23 Well Mode changed to Flowing
1975-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-04 Perforation Treatment Performed - Cement Squeeze
1980-04-07 Perforation Treatment Performed - Jet Perforation
1980-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-04 Well Fluid changed to Crude Oil
1990-07-04 Well Mode changed to Suspended
1999-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-05 Plug Back Performed
1999-10-05 Well Fluid changed to Crude Oil
1999-10-05 Well Log Performed
1999-10-05 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-10-12 Open Hole/Barefoot Completion 2580.70 2584.10 0
1975-01-06 Acid Treatment 2580.70 2584.10 0
1980-04-04 Cement Squeeze 2580.70 2584.10 0
1980-04-07 Perforation 2575.00 2579.50 13
1980-04-08 Acid Treatment 2575.00 2579.50 0
1999-10-05 Packing Device Capped w/Cement 2527.00 2535.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 817 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 7117 0.0 0.0 0.0
1970 7177 0.0 0.0 0.0
1971 7310 0.0 0.0 0.0
1972 7058 0.0 0.0 0.0
1973 7266 0.0 0.0 0.0
1974 2867 0.0 0.0 0.0
1975 7524 0.0 0.0 0.0
1976 5824 0.0 0.0 0.0
1977 6818 0.0 0.0 0.0
1978 6939 0.0 0.0 0.0
1979 5322 0.0 0.0 0.0
1980 674 0.0 0.0 0.0
1985 468 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1957-09-15 Lost Circulation 1149.00 1194.80
1957-10-01 Lost Circulation 1837.90 1909.50
1957-10-09 Lost Circulation 2133.20 2570.60

For data sources see[6]

References