X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355010415000

Well Details

Well ID: 0355010415000
Loading map...
Location: 00/15-04-035-01W5/0
Location Alias: 00/15-04-35-01 W5M
Location Alias 2: 00/15-04-035-01 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 01
Section: 04
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 15-4-35-1
Operator Name: Enhance Energy Inc.
License Number: 0014269
License Date: 1957-11-18
License Status: Suspension
Spud Date: 1957-11-21
Final Drill Date: 1958-01-03
Well Total Depth: 2601.80 m
Surface Hole Latitude: 51.983004
Surface Hole Longitude: -114.081301

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-11-18 Obtained License
1957-12-07 Drill Stem Test Performed
1957-12-31 Production Casing Operation Performed
1958-01-03 Finished Drilling
1958-01-03 Perforation Treatment Performed - Open-Hole Completion
1958-01-03 Well Mode changed to Drilled and Cased
1958-01-16 Well Began Production
1958-01-16 Well Fluid changed to Crude Oil
1958-01-16 Well Mode changed to Flowing
1986-03-04 Well Log Performed
1986-03-07 Perforation Treatment Performed - Cement Plug
1986-03-07 Perforation Treatment Performed - Open-Hole Completion
1986-03-07 Well Log Performed
1986-03-10 Well Log Performed
1986-03-13 Perforation Treatment Performed - Jet Perforation
1986-03-13 Well Log Performed
1986-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-27 Well Fluid changed to Crude Oil
1989-07-27 Well Mode changed to Pumping
2013-11-01 Well Fluid changed to Crude Oil
2013-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-01-03 Open Hole/Barefoot Completion 2590.80 2601.80 0
1986-03-07 Cement Plug 2592.50 2601.80 0
1986-03-07 Open Hole/Barefoot Completion 2590.80 2592.50 0
1986-03-13 Perforation 2587.30 2590.30 13
1986-03-14 Acid Treatment 2587.30 2590.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1986 4408 0.0 0.0 0.0
1987 8069 0.0 0.0 0.0
1988 5124 0.0 0.0 0.0
1989 2386 0.0 0.0 0.0
1990 7158 0.0 0.0 0.0
1991 7273 0.0 0.0 0.0
1992 8135 0.0 0.0 0.0
1993 7543 0.0 0.0 0.0
1994 7312 0.0 0.0 0.0
1995 8062 0.0 0.0 0.0
1996 8185 0.0 0.0 0.0
1997 6467 0.0 0.0 0.0
1998 7266 0.0 0.0 0.0
1999 8158 0.0 0.0 0.0
2000 7357 0.0 0.0 0.0
2001 7700 0.0 0.0 0.0
2002 7041 0.0 0.0 0.0
2003 7852 0.0 0.0 0.0
2004 7914 0.0 0.0 0.0
2005 7460 0.0 0.0 0.0
2006 8385 0.0 0.0 0.0
2007 8589 0.0 0.0 0.0
2008 6986 0.0 0.0 0.0
2009 4956 0.0 0.0 0.0
2010 6710 0.0 0.0 0.0
2011 8267 0.0 0.0 0.0
2012 4943 0.0 0.0 0.0

For data sources see[5]

References