X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354271608000

Well Details

Well ID: 0354271608000
Loading map...
Location: 00/08-16-035-27W4/0
Location Alias: 00/08-16-35-27 W4M
Location Alias 2: 00/08-16-035-27 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 27
Section: 16
County/Municipality: Red Deer County
Well Name: EMBER DAVEY 8-16-35-27
Operator Name: Ember Resources Inc.
License Number: 0383873
License Date: 2007-10-29
License Status: Issued
Spud Date: 2007-12-14
Final Drill Date: 2007-12-16
Well Total Depth: 1185.00 m
Surface Hole Latitude: 52.004453
Surface Hole Longitude: -113.790978

For data sources see[1][2]

Well History

Date Event
2007-10-29 Obtained License
2007-12-14 Surface Casing Operation Performed
2007-12-16 Finished Drilling
2007-12-16 Production Casing Operation Performed
2007-12-16 Rig Released
2007-12-16 Well Mode changed to Drilled and Cased
2008-01-16 Well Log Performed
2008-02-23 Perforation Treatment Performed - Jet Perforation
2008-02-23 Well Log Performed
2009-02-09 Perforation Treatment Performed - Jet Perforation
2009-02-11 Well Log Performed
2009-02-14 Perforation Treatment Performed - Fractured
2017-03-29 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-02-23 Perforation 1154.00 1157.00 13
2009-02-09 Perforation 764.70 765.20 13
2009-02-09 Perforation 772.50 774.00 13
2009-02-09 Perforation 782.10 782.60 13
2009-02-09 Perforation 791.50 793.00 13
2009-02-09 Perforation 822.00 823.00 13
2009-02-09 Perforation 826.50 827.00 13
2009-02-14 Fracture 826.50 827.00 0
2009-02-14 Fracture 822.00 823.00 0
2009-02-14 Fracture 791.50 793.00 0
2009-02-14 Fracture 782.10 782.60 0
2009-02-09 Perforation 439.00 440.00 13
2009-02-14 Fracture 772.50 774.00 0
2009-02-14 Fracture 764.70 765.20 0
2009-02-14 Fracture 755.00 757.00 0
2009-02-14 Fracture 751.00 752.00 0
2009-02-14 Fracture 677.90 678.90 0
2009-02-14 Fracture 673.20 674.20 0
2009-02-14 Fracture 665.00 666.00 0
2009-02-14 Fracture 614.80 615.30 0
2009-02-14 Fracture 553.90 554.40 0
2009-02-14 Fracture 439.00 440.00 0
2009-02-09 Perforation 553.90 554.40 13
2009-02-09 Perforation 614.80 615.30 13
2009-02-09 Perforation 665.00 666.00 13
2009-02-09 Perforation 673.20 674.20 13
2009-02-09 Perforation 677.90 678.90 13
2009-02-09 Perforation 751.00 752.00 13
2009-02-09 Perforation 755.00 757.00 13

For data sources see[4]



References