X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354270611002

Well Details

Well ID: 0354270611002
Loading map...
Location: 00/11-06-035-27W4/2
Location Alias: 00/11-06-35-27 W4M
Location Alias 2: 00/11-06-035-27 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 27
Section: 06
County/Municipality: Red Deer County
Well Name: CPC RESOURCES DAVEY 11-6-35-27
Operator Name: Lynx Energy ULC
License Number: 0394635
License Date: 2008-02-22
License Status: Issued
Spud Date: 2008-03-01
Final Drill Date: 2008-03-03
Well Total Depth: 1208.00 m
Surface Hole Latitude: 51.976618
Surface Hole Longitude: -113.851221

For data sources see[1][2]

Well History

Date Event
2008-02-22 Obtained License
2008-03-01 Surface Casing Operation Performed
2008-03-02 Well Log Performed
2008-03-03 Finished Drilling
2008-03-03 Production Casing Operation Performed
2008-03-03 Well Mode changed to Drilled and Cased
2008-03-04 Rig Released
2008-03-08 Well Log Performed
2008-07-03 Perforation Treatment Performed - Jet Perforation
2008-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-20 Perforation Treatment Performed - Jet Perforation
2008-07-20 Plug Back Performed
2008-07-23 Perforation Treatment Performed - Fractured
2008-07-25 Well Fluid changed to Coalbed Methane-Coals and Other
2008-07-25 Well Mode changed to Testing
2008-11-04 Well Began Production
2008-11-04 Well Fluid changed to Coalbed Methane-Coals and Other
2008-11-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-07-03 Perforation 965.00 966.00 13
2008-07-20 Perforation 637.10 638.60 7
2008-07-20 Perforation 688.00 689.00 7
2008-07-20 Perforation 705.00 706.00 7
2008-07-20 Perforation 774.30 775.80 7
2008-07-20 Perforation 778.00 779.00 7
2008-07-20 Perforation 781.20 782.20 7
2008-07-20 Perforation 787.80 789.30 7
2008-07-20 Perforation 793.50 794.50 7
2008-07-20 Perforation 795.50 796.50 7
2008-07-20 Perforation 813.50 814.50 7
2008-07-20 Packing Device Capped w/Cement 954.00 962.00 0
2008-07-20 Perforation 827.50 828.50 7
2008-07-20 Perforation 841.20 842.20 7
2008-07-20 Perforation 853.00 854.00 7
2008-07-23 Fracture 343.40 854.00 0
2008-07-20 Perforation 343.40 346.90 7
2008-07-20 Perforation 349.40 350.40 7
2008-07-20 Perforation 378.50 379.50 7
2008-07-20 Perforation 448.50 449.50 7
2008-07-20 Perforation 458.70 459.70 7
2008-07-20 Perforation 579.50 580.50 7
2008-07-20 Perforation 582.20 583.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1484 0.0 0.0 0.0
2009 8721 0.0 0.0 0.0
2010 8697 0.0 0.0 0.0
2011 8716 0.0 0.0 0.0
2012 8470 0.0 0.0 0.0
2013 8747 0.0 0.0 0.0
2014 8745 0.0 0.0 0.0
2015 8583 0.0 0.0 0.0
2016 8742 0.0 0.0 0.0
2017 8745 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References