X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354263510022

Well Details

Well ID: 0354263510022
Loading map...
Location: 02/10-35-035-26W4/2
Location Alias: 02/10-35-35-26 W4M
Location Alias 2: 02/10-35-035-26 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 35
County/Municipality: Red Deer County
Well Name: PINE CLIFF THREEHCK 10-35-35-26
Operator Name: Pine Cliff Energy Ltd.
License Number: 0145715
License Date: 1990-10-05
License Status: Issued
Spud Date: 1990-10-15
Final Drill Date: 1990-10-23
Well Total Depth: 1605.00 m
Surface Hole Latitude: 52.050420
Surface Hole Longitude: -113.609697

For data sources see[1][2]

Well History

Date Event
1990-10-05 Obtained License
1990-10-15 Lost Circulation Occurred
1990-10-17 Surface Casing Operation Performed
1990-10-20 Drill Stem Test Performed
1990-10-21 Drill Stem Test Performed
1990-10-23 Finished Drilling
1990-10-23 Well Mode changed to Drilled and Cased
1990-10-24 Drill Stem Test Performed
1990-10-24 Well Log Performed
1990-10-25 Drill Stem Test Performed
1990-10-26 Production Casing Operation Performed
1990-10-27 Rig Released
1990-11-01 Well Log Performed
1990-11-04 Perforation Treatment Performed - Abrasa-Jet Perforation
1993-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-01-25 Plug Back Performed
1993-01-25 Well Log Performed
1993-01-26 Perforation Treatment Performed - Jet Perforation
1993-01-28 Well Began Production
1993-01-28 Well Fluid changed to Gas
1993-01-28 Well Mode changed to Flowing
1998-09-10 Perforation Treatment Performed - Jet Perforation
1998-09-10 Well Log Performed
1998-09-13 Well Fluid changed to Gas
1998-09-13 Well Mode changed to Flowing
2003-12-04 Well Fluid changed to Gas
2003-12-04 Well Mode changed to Flowing
2006-01-01 Well Fluid changed to Gas
2006-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-11-04 Hydra Jet Perforation 1557.00 1559.50 0
1993-01-25 Packing Device Capped w/Cement 1546.00 1554.00 0
1993-01-26 Perforation 981.00 989.00 14
1998-09-10 Perforation 839.50 844.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7830 0.0 0.0 0.0
1994 8563 0.0 0.0 0.0
1995 8425 0.0 0.0 0.0
1996 8562 0.0 0.0 0.0
1997 8694 0.0 0.0 0.0
1998 8741 0.0 0.0 0.0
1999 8683 0.0 0.0 0.0
2000 8781 0.0 0.0 0.0
2001 8711 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8711 0.0 0.0 0.0
2004 8768 0.0 0.0 0.0
2005 8615 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8745 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8659 0.0 0.0 0.0
2011 8450 0.0 0.0 0.0
2012 8298 0.0 0.0 0.0
2013 8734 0.0 0.0 0.0
2014 8062 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8580 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-10-15 Lost Circulation 14.00 184.00

For data sources see[6]

References