X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354263314000

Well Details

Well ID: 0354263314000
Loading map...
Location: 00/14-33-035-26W4/0
Location Alias: 00/14-33-35-26 W4M
Location Alias 2: 00/14-33-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 33
County/Municipality: Red Deer County
Well Name: CPC RESOURCES THREEHCK 14-33-35-26
Operator Name: Lynx Energy ULC
License Number: 0380951
License Date: 2007-08-24
License Status: Issued
Spud Date: 2007-09-08
Final Drill Date: 2007-09-12
Well Total Depth: 1095.00 m
Surface Hole Latitude: 52.055045
Surface Hole Longitude: -113.659970

For data sources see[1][2]

Well History

Date Event
2007-08-24 Obtained License
2007-09-09 Surface Casing Operation Performed
2007-09-11 Production Casing Operation Performed
2007-09-12 Finished Drilling
2007-09-12 Rig Released
2007-09-12 Well Mode changed to Drilled and Cased
2007-09-18 Well Log Performed
2007-09-24 Perforation Treatment Performed - Jet Perforation
2007-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-04 Perforation Treatment Performed - Jet Perforation
2007-10-04 Plug Back Performed
2007-10-04 Well Mode changed to Abandoned Zone
2007-10-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-09-24 Perforation 1071.00 1072.00 13
2007-10-04 Perforation 717.50 719.00 7
2007-10-04 Perforation 710.60 711.60 7
2007-10-04 Perforation 700.20 701.20 7
2007-10-04 Perforation 694.00 695.00 7
2007-10-04 Perforation 682.40 683.40 7
2007-10-04 Perforation 674.00 675.00 7
2007-10-04 Perforation 654.50 655.50 7
2007-10-04 Perforation 597.40 598.40 7
2007-10-04 Perforation 535.00 536.00 7
2007-10-04 Perforation 489.80 490.80 7
2007-10-04 Packing Device Capped w/Cement 1057.00 1065.00 0
2007-10-04 Perforation 483.50 484.50 7
2007-10-04 Perforation 470.10 471.10 7
2007-10-04 Perforation 370.40 371.90 7
2007-10-04 Perforation 361.60 363.10 7
2007-10-04 Perforation 355.00 356.00 7
2007-10-04 Perforation 318.50 319.50 7
2007-10-04 Perforation 272.50 274.50 7
2007-10-23 Fracture 272.50 747.50 0
2007-10-04 Perforation 746.50 747.50 7
2007-10-04 Perforation 743.30 744.80 7
2007-10-04 Perforation 737.00 738.00 7
2007-10-04 Perforation 731.30 732.30 7
2007-10-04 Perforation 724.90 725.90 7
2007-10-04 Perforation 722.90 724.40 7
2007-10-04 Perforation 721.20 722.20 7

For data sources see[4]



References