X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354263208020

Well Details

Well ID: 0354263208020
Loading map...
Location: 02/08-32-035-26W4/0
Location Alias: 02/08-32-35-26 W4M
Location Alias 2: 02/08-32-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 32
County/Municipality: Red Deer County
Well Name: CPC RESOURCES THREEHCK 8-32-35-26
Operator Name: Lynx Energy ULC
License Number: 0364039
License Date: 2006-10-05
License Status: Issued
Spud Date: 2006-10-08
Final Drill Date: 2006-10-10
Well Total Depth: 1084.00 m
Surface Hole Latitude: 52.046313
Surface Hole Longitude: -113.672043

For data sources see[1][2]

Well History

Date Event
2006-10-05 Obtained License
2006-10-09 Surface Casing Operation Performed
2006-10-10 Finished Drilling
2006-10-10 Production Casing Operation Performed
2006-10-10 Rig Released
2006-10-10 Well Mode changed to Drilled and Cased
2006-10-25 Well Log Performed
2006-11-04 Perforation Treatment Performed - Jet Perforation
2006-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-08 Perforation Treatment Performed - Jet Perforation
2006-11-08 Plug Back Performed
2006-11-08 Well Mode changed to Abandoned Zone
2006-11-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-11-04 Perforation 1041.40 1042.90 20
2006-11-08 Perforation 480.00 481.00 7
2006-11-08 Perforation 490.00 491.90 7
2006-11-08 Perforation 502.00 503.00 7
2006-11-08 Perforation 581.00 582.00 7
2006-11-08 Perforation 589.00 590.00 7
2006-11-08 Perforation 596.40 597.40 7
2006-11-08 Perforation 642.70 643.70 7
2006-11-08 Perforation 663.00 664.00 7
2006-11-08 Perforation 671.70 672.70 7
2006-11-08 Perforation 707.20 708.20 7
2006-11-08 Packing Device Capped w/Cement 1027.00 1035.00 0
2006-11-08 Perforation 713.10 715.10 7
2006-11-08 Perforation 720.50 721.50 7
2006-11-08 Perforation 732.50 733.50 7
2006-11-08 Perforation 735.60 736.60 7
2006-11-18 Fracture 313.50 736.60 0
2006-11-08 Perforation 313.50 316.00 7
2006-11-08 Perforation 347.30 348.30 7
2006-11-08 Perforation 356.00 357.50 7
2006-11-08 Perforation 364.20 365.70 7
2006-11-08 Perforation 369.80 370.80 7
2006-11-08 Perforation 472.00 473.00 7
2006-11-08 Perforation 476.00 477.50 7

For data sources see[4]



References