If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354263206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.047412,"lon":-113.68729,"icon":""}]} |
Location: 00/06-32-035-26W4/0 | |
Location Alias: 00/06-32-35-26 W4M | |
Location Alias 2: 00/06-32-035-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 26 | |
Section: 32 | |
County/Municipality: Red Deer County | |
Well Name: CPC RESOURCES THREEHCK 6-32-35-26 | |
Operator Name: Lynx Energy ULC | |
License Number: 0360537 | |
License Date: 2006-07-21 | |
License Status: Amended | |
Spud Date: 2006-08-22 | |
Final Drill Date: 2006-08-24 | |
Well Total Depth: 1119.00 m | |
Surface Hole Latitude: 52.047412 | |
Surface Hole Longitude: -113.687290 |
Date | Event |
---|---|
2006-07-21 | Obtained License |
2006-08-15 | Surface Casing Operation Performed |
2006-08-23 | Direction Drilling Operation Performed - Deviate |
2006-08-24 | Finished Drilling |
2006-08-24 | Production Casing Operation Performed |
2006-08-24 | Rig Released |
2006-08-24 | Well Mode changed to Drilled and Cased |
2006-09-01 | Well Log Performed |
2006-09-27 | Perforation Treatment Performed - Jet Perforation |
2006-10-06 | Perforation Treatment Performed - Jet Perforation |
2006-11-11 | Perforation Treatment Performed - Fractured |
2006-11-28 | Well Began Production |
2006-11-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-11-28 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-08-23 | 185.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-27 | Perforation | 814.00 | 815.00 | 20 |
2006-10-06 | Perforation | 477.00 | 478.00 | 7 |
2006-10-06 | Perforation | 487.30 | 488.30 | 7 |
2006-10-06 | Perforation | 496.00 | 497.00 | 7 |
2006-10-06 | Perforation | 511.30 | 512.30 | 7 |
2006-10-06 | Perforation | 607.00 | 608.00 | 7 |
2006-10-06 | Perforation | 618.50 | 619.50 | 7 |
2006-10-06 | Perforation | 664.50 | 665.50 | 7 |
2006-10-06 | Perforation | 685.00 | 686.00 | 7 |
2006-10-06 | Perforation | 694.30 | 965.30 | 7 |
2006-10-06 | Perforation | 698.50 | 699.50 | 7 |
2006-09-27 | Perforation | 812.00 | 813.00 | 20 |
2006-10-06 | Perforation | 707.50 | 708.50 | 7 |
2006-10-06 | Perforation | 710.00 | 711.00 | 7 |
2006-10-06 | Perforation | 720.00 | 721.00 | 7 |
2006-10-06 | Perforation | 732.30 | 733.30 | 7 |
2006-10-06 | Perforation | 735.70 | 736.60 | 7 |
2006-10-06 | Perforation | 741.00 | 742.50 | 7 |
2006-10-06 | Perforation | 747.50 | 748.50 | 7 |
2006-10-06 | Perforation | 750.00 | 751.00 | 7 |
2006-10-06 | Perforation | 753.50 | 754.50 | 7 |
2006-10-06 | Perforation | 761.00 | 762.00 | 7 |
2006-09-27 | Perforation | 788.50 | 790.00 | 20 |
2006-10-06 | Perforation | 765.00 | 766.00 | 7 |
2006-11-11 | Fracture | 355.00 | 815.00 | 0 |
2006-10-06 | Perforation | 355.00 | 356.00 | 7 |
2006-10-06 | Perforation | 363.50 | 365.00 | 7 |
2006-10-06 | Perforation | 369.40 | 370.40 | 7 |
2006-10-06 | Perforation | 374.90 | 376.40 | 7 |
2006-10-06 | Perforation | 379.50 | 380.50 | 7 |
2006-10-06 | Perforation | 472.00 | 473.00 | 7 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 816 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8779 | 0.0 | 0.0 | 0.0 |
2013 | 8550 | 0.0 | 0.0 | 0.0 |
2014 | 8613 | 0.0 | 0.0 | 0.0 |
2015 | 8718 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8736 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]