X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354261708000

Well Details

Well ID: 0354261708000
Loading map...
Location: 00/08-17-035-26W4/0
Location Alias: 00/08-17-35-26 W4M
Location Alias 2: 00/08-17-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 17
County/Municipality: Red Deer County
Well Name: JEFF LAKE B.A. KNEEHILL 8-17-35-26
Operator Name: ExxonMobil Canada Ltd.
License Number: 0023263
License Date: 1962-11-05
License Status: RecCertified
Spud Date: 1962-11-08
Final Drill Date: 1962-12-03
Well Total Depth: 2305.80 m
Surface Hole Latitude: 52.003250
Surface Hole Longitude: -113.674230

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-05 Obtained License
1962-11-16 Drill Stem Test Performed
1962-11-30 Drill Stem Test Performed
1962-12-02 Drill Stem Test Performed
1962-12-03 Finished Drilling
1962-12-05 Drill Stem Test Performed
1962-12-07 Production Casing Operation Performed
1962-12-10 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-10 Perforation Treatment Performed - Bullet Perforation
1962-12-11 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-12 Perforation Treatment Performed - Jet Perforation
1962-12-16 Perforation Treatment Performed - Jet Perforation
1962-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-20 Perforation Treatment Performed - Nitrogen Treatment
1963-01-01 Perforation Treatment Performed - Cement Squeeze
1963-01-04 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-01-04 Perforation Treatment Performed - Acid Wash - No Pressure
1963-01-06 Perforation Treatment Performed - Acid Wash - No Pressure
1963-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-12 Perforation Treatment Performed - Nitrogen Treatment
1963-01-14 Perforation Treatment Performed - Jet Perforation
1963-01-16 Perforation Treatment Performed - Cement Squeeze
1963-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-08 Perforation Treatment Performed - Bullet Perforation
1963-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-10 Perforation Treatment Performed - Nitrogen Treatment
1963-03-11 Perforation Treatment Performed - Bullet Perforation
1963-03-12 Perforation Treatment Performed - Bullet Perforation
1963-03-14 Perforation Treatment Performed - Bullet Perforation
1963-03-14 Perforation Treatment Performed - Cement Squeeze
1963-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-17 Perforation Treatment Performed - Condensate Squeeze
1963-03-19 Perforation Treatment Performed - Condensate Squeeze
1963-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-16 Perforation Treatment Performed - Bullet Perforation
1963-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-18 Well Mode changed to Drilled and Cased
1964-11-02 Well Type changed to Observation
1990-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-18 Perforation Treatment Performed - Jet Perforation
1990-03-18 Plug Back Performed
1990-03-18 Well Mode changed to Abandoned
1990-03-18 Well Type changed to Observation
1990-03-19 Perforation Treatment Performed - Remedial Casing
1990-03-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-12-10 Bullet Perforation 2289.40 2290.30 7
1962-12-20 Acid Treatment 2287.80 2290.30 0
1963-01-01 Cement Squeeze 2287.80 2290.30 0
1963-01-04 Hydra Jet Perforation 2288.10 2288.10 0
1963-01-04 Acid Wash 2288.10 2288.10 0
1963-01-06 Acid Wash 2288.10 2288.10 0
1963-01-08 Acid Treatment 2288.10 2288.10 0
1963-01-09 Acid Treatment 2288.10 2288.10 0
1963-01-12 Nitrogen Treatment 2288.10 2288.10 0
1963-01-12 Acid Treatment 2288.10 2288.10 0
1963-01-14 Perforation 2293.90 2294.20 16
1962-12-10 Acid Wash 2289.40 2290.30 0
1963-01-16 Cement Squeeze 2288.10 2294.20 0
1963-03-08 Bullet Perforation 2288.10 2288.70 13
1963-03-08 Acid Treatment 2288.10 2288.70 0
1963-03-10 Nitrogen Treatment 2288.10 2288.70 0
1963-03-10 Acid Treatment 2288.10 2288.70 0
1963-03-11 Bullet Perforation 2291.50 2292.70 13
1963-03-12 Bullet Perforation 2282.60 2283.90 13
1963-03-14 Cement Squeeze 2282.60 2292.70 0
1963-03-14 Bullet Perforation 2289.00 2289.70 13
1963-03-15 Acid Treatment 2289.00 2289.70 0
1962-12-11 Acid Wash 2289.40 2290.30 0
1963-03-17 Condensate Squeeze 2289.00 2289.70 0
1963-03-19 Condensate Squeeze 2289.00 2289.70 0
1963-03-20 Acid Treatment 2289.00 2289.70 0
1963-06-16 Bullet Perforation 2289.70 2290.60 7
1963-06-17 Acid Treatment 2289.70 2290.60 0
1963-06-19 Acid Treatment 2289.70 2290.60 0
1990-03-18 Packing Device Capped w/Cement 2254.00 2254.00 0
1990-03-18 Perforation 300.00 302.00 13
1990-03-19 Remedial Casing Cementing 300.00 302.00 0
1962-12-12 Perforation 2289.40 2290.30 7
1962-12-16 Perforation 2287.80 2290.30 13
1962-12-16 Perforation 2288.70 2290.30 13
1962-12-17 Acid Treatment 2287.80 2290.30 0
1962-12-20 Acid Treatment 2287.80 2290.30 0
1962-12-20 Nitrogen Treatment 2287.80 2290.30 0

For data sources see[4]



References