If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354253310004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.051269,"lon":-113.513514,"icon":""}]} |
Location: 00/10-33-035-25W4/4 | |
Location Alias: 00/10-33-35-25 W4M | |
Location Alias 2: 00/10-33-035-25 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 25 | |
Section: 33 | |
County/Municipality: Red Deer County | |
Well Name: EMBER DD THREEHCK 10-33-35-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410603 | |
License Date: 2009-05-25 | |
License Status: Issued | |
Spud Date: 2009-08-23 | |
Final Drill Date: 2009-08-27 | |
Well Total Depth: 1109.00 m | |
Surface Hole Latitude: 52.051269 | |
Surface Hole Longitude: -113.513514 |
Date | Event |
---|---|
2009-05-25 | Obtained License |
2009-08-23 | Surface Casing Operation Performed |
2009-08-26 | Direction Drilling Operation Performed - Deviate |
2009-08-27 | Finished Drilling |
2009-08-27 | Well Log Performed |
2009-08-27 | Well Mode changed to Drilled and Cased |
2009-08-28 | Production Casing Operation Performed |
2009-08-28 | Rig Released |
2009-10-24 | Perforation Treatment Performed - Jet Perforation |
2009-10-24 | Well Log Performed |
2009-10-30 | Perforation Treatment Performed - Fractured |
2009-11-07 | Perforation Treatment Performed - Jet Perforation |
2009-11-07 | Well Log Performed |
2009-11-11 | Perforation Treatment Performed - Jet Perforation |
2009-11-11 | Well Log Performed |
2009-11-16 | Perforation Treatment Performed - Fractured |
2009-11-20 | Well Log Performed |
2011-07-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-07-25 | Plug Back Performed |
2011-07-25 | Well Log Performed |
2011-08-01 | Perforation Treatment Performed - Jet Perforation |
2011-10-19 | Perforation Treatment Performed - Fractured |
2011-10-25 | Well Began Production |
2011-10-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-25 | Well Mode changed to Flowing |
2017-04-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-04-11 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-08-26 | 619.70 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-24 | Perforation | 1062.00 | 1066.00 | 17 |
2011-08-01 | Perforation | 442.00 | 443.00 | 13 |
2011-08-01 | Perforation | 476.50 | 478.00 | 13 |
2011-08-01 | Perforation | 515.00 | 516.00 | 13 |
2011-08-01 | Perforation | 553.40 | 553.90 | 13 |
2011-08-01 | Perforation | 563.30 | 565.30 | 13 |
2011-08-01 | Perforation | 575.30 | 576.30 | 13 |
2011-08-01 | Perforation | 607.20 | 608.20 | 13 |
2011-08-01 | Perforation | 612.30 | 613.30 | 13 |
2011-08-01 | Perforation | 627.90 | 628.90 | 13 |
2011-08-01 | Perforation | 629.50 | 631.00 | 13 |
2009-10-30 | Fracture | 1062.00 | 1066.00 | 0 |
2011-08-01 | Perforation | 650.90 | 651.90 | 13 |
2011-08-01 | Perforation | 668.60 | 669.60 | 13 |
2011-08-01 | Perforation | 688.70 | 689.20 | 13 |
2011-08-01 | Perforation | 691.30 | 692.30 | 13 |
2011-08-01 | Perforation | 701.00 | 702.00 | 13 |
2011-08-01 | Perforation | 707.30 | 709.30 | 13 |
2011-08-01 | Perforation | 717.50 | 718.50 | 13 |
2011-10-19 | Fracture | 431.50 | 718.50 | 0 |
2009-11-07 | Perforation | 1018.00 | 1021.00 | 17 |
2009-11-11 | Perforation | 924.00 | 926.50 | 17 |
2009-11-11 | Perforation | 972.50 | 974.50 | 17 |
2009-11-16 | Fracture | 924.00 | 974.50 | 0 |
2009-11-16 | Fracture | 1018.00 | 1021.00 | 0 |
2011-07-25 | Packing Device Capped w/Cement | 913.00 | 921.00 | 0 |
2011-08-01 | Perforation | 431.50 | 432.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1353 | 0.0 | 0.0 | 0.0 |
2012 | 8483 | 0.0 | 0.0 | 0.0 |
2013 | 8189 | 0.0 | 0.0 | 0.0 |
2014 | 7976 | 0.0 | 0.0 | 0.0 |
2015 | 8528 | 0.0 | 0.0 | 0.0 |
2016 | 8560 | 0.0 | 0.0 | 0.0 |
2017 | 8166 | 0.0 | 0.0 | 0.0 |
2018 | 8269 | 0.0 | 0.0 | 0.0 |
2019 | 7283 | 0.0 | 0.0 | 0.0 |
2020 | 2072 | 0.0 | 0.0 | 0.0 |
For data sources see[6]