X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354253016000

Well Details

Well ID: 0354253016000
Loading map...
Location: 00/16-30-035-25W4/0
Location Alias: 00/16-30-35-25 W4M
Location Alias 2: 00/16-30-035-25 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 25
Section: 30
County/Municipality: Red Deer County
Well Name: CPC RESOURCES THREEHCK 16-30-35-25
Operator Name: Lynx Energy ULC
License Number: 0368995
License Date: 2006-12-14
License Status: Issued
Spud Date: 2006-12-19
Final Drill Date: 2006-12-21
Well Total Depth: 1033.00 m
Surface Hole Latitude: 52.038561
Surface Hole Longitude: -113.554813

For data sources see[1][2]

Well History

Date Event
2006-12-14 Obtained License
2006-12-20 Surface Casing Operation Performed
2006-12-21 Finished Drilling
2006-12-21 Production Casing Operation Performed
2006-12-21 Rig Released
2006-12-21 Well Log Performed
2006-12-21 Well Mode changed to Drilled and Cased
2007-01-04 Well Log Performed
2007-02-01 Perforation Treatment Performed - Jet Perforation
2007-02-13 Perforation Treatment Performed - Fractured
2007-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-23 Perforation Treatment Performed - Jet Perforation
2007-02-23 Plug Back Performed
2007-02-23 Well Mode changed to Abandoned Zone
2007-02-26 Perforation Treatment Performed - Fractured
2007-07-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-02-01 Perforation 968.40 970.40 13
2007-02-23 Perforation 438.50 439.50 7
2007-02-23 Perforation 479.80 480.80 7
2007-02-23 Perforation 537.50 538.50 7
2007-02-23 Perforation 539.20 540.20 7
2007-02-23 Perforation 542.70 543.70 7
2007-02-23 Perforation 547.10 549.10 7
2007-02-23 Perforation 553.30 554.30 7
2007-02-23 Perforation 558.10 559.10 7
2007-02-23 Perforation 573.10 574.10 7
2007-02-23 Perforation 588.40 589.40 7
2007-02-13 Fracture 968.40 970.40 0
2007-02-23 Perforation 591.20 592.20 7
2007-02-23 Perforation 597.00 598.00 7
2007-02-23 Perforation 600.50 601.50 7
2007-02-23 Perforation 608.70 609.70 7
2007-02-23 Perforation 611.40 612.90 7
2007-02-23 Perforation 626.70 627.70 7
2007-02-23 Perforation 629.50 630.50 7
2007-02-23 Perforation 640.10 641.10 7
2007-02-23 Perforation 648.70 649.70 7
2007-02-23 Perforation 655.80 656.80 7
2007-02-23 Packing Device Capped w/Cement 952.00 960.00 0
2007-02-23 Perforation 658.10 659.60 7
2007-02-23 Perforation 668.20 669.20 7
2007-02-23 Perforation 672.50 673.50 7
2007-02-23 Perforation 680.70 681.70 7
2007-02-23 Perforation 683.90 684.90 7
2007-02-23 Perforation 726.00 727.00 7
2007-02-23 Perforation 745.00 747.50 7
2007-02-26 Fracture 297.30 747.50 0
2007-02-23 Perforation 297.30 298.30 7
2007-02-23 Perforation 302.00 303.00 7
2007-02-23 Perforation 311.10 312.10 7
2007-02-23 Perforation 407.60 408.60 7
2007-02-23 Perforation 410.80 411.80 7
2007-02-23 Perforation 422.50 425.00 7

For data sources see[4]



References