If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354252305020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.018137,"lon":-113.474849,"icon":""}]} |
Location: 02/05-23-035-25W4/0 | |
Location Alias: 02/05-23-35-25 W4M | |
Location Alias 2: 02/05-23-035-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 25 | |
Section: 23 | |
County/Municipality: Red Deer County | |
Well Name: HIGHPOINTOILINC HUXLEY 5-23-35-25 | |
Operator Name: High Point Oil Inc. | |
License Number: 0489265 | |
License Date: 2018-05-24 | |
License Status: Issued | |
Spud Date: 2018-07-21 | |
Final Drill Date: 2018-07-28 | |
Well Total Depth: 2250.00 m | |
Surface Hole Latitude: 52.018137 | |
Surface Hole Longitude: -113.474849 |
Date | Event |
---|---|
2018-05-24 | Obtained License |
2018-07-22 | Surface Casing Operation Performed |
2018-07-23 | Direction Drilling Operation Performed - Deviate |
2018-07-28 | Finished Drilling |
2018-07-28 | Well Mode changed to Drilled and Cased |
2018-07-29 | Well Log Performed |
2018-07-30 | Production Casing Operation Performed |
2018-07-30 | Rig Released |
2018-08-08 | Perforation Treatment Performed - Jet Perforation |
2018-08-10 | Perforation Treatment Performed - Jet Perforation |
2018-08-11 | Perforation Treatment Performed - Jet Perforation |
2018-08-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-07-21 | Savanna Drilling Corp. | 437 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-07-23 | 1128.60 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-08 | Perforation | 2205.00 | 2217.00 | 20 |
2018-08-10 | Perforation | 2199.00 | 2202.00 | 20 |
2018-08-11 | Perforation | 2187.00 | 2199.00 | 20 |
2018-08-16 | Packing Device Capped w/Cement | 2175.50 | 2184.00 | 0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-07-26 | No Incident Encountered | 0.00 | 0.00 |
2018-08-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]