X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354242201020

Well Details

Well ID: 0354242201020
Loading map...
Location: 02/01-22-035-24W4/0
Location Alias: 02/01-22-35-24 W4M
Location Alias 2: 02/01-22-035-24 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 24
Section: 22
County/Municipality: Red Deer County
Well Name: RIFE 02 HZ HUXLEY 1-22-35-24
Operator Name: Rife Resources Ltd.
License Number: 0485005
License Date: 2017-08-14
License Status: Issued
Spud Date: 2017-09-12
Final Drill Date: 2017-09-24
Well Total Depth: 3808.00 m
Surface Hole Latitude: 52.027997
Surface Hole Longitude: -113.344258

For data sources see[1][2]

Well History

Date Event
2017-08-14 Obtained License
2017-09-12 Lost Circulation Occurred
2017-09-12 Surface Casing Operation Performed
2017-09-13 Lost Circulation Occurred
2017-09-17 Direction Drilling Operation Performed - Deviate
2017-09-20 Direction Drilling Operation Performed - Horizontal
2017-09-22 Production Casing Operation Performed
2017-09-24 Finished Drilling
2017-09-24 Well Log Performed
2017-09-24 Well Mode changed to Drilled and Cased
2017-09-27 Rig Released
2017-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-10 Well Began Production
2017-10-10 Well Fluid changed to Crude Oil
2017-10-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-12 Horizon Drilling Inc. 23 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-17 1684.40 Deviate (5 - 79 degrees)
2017-09-20 2388.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-06 Multi-Stage Fracture 3778.50 3778.60 0
2017-10-07 Multi-Stage Fracture 3464.80 3464.90 0
2017-10-07 Multi-Stage Fracture 3425.00 3425.10 0
2017-10-07 Multi-Stage Fracture 3397.90 3398.00 0
2017-10-07 Multi-Stage Fracture 3358.10 3358.20 0
2017-10-07 Multi-Stage Fracture 3318.30 3318.40 0
2017-10-08 Multi-Stage Fracture 3291.20 3291.30 0
2017-10-08 Multi-Stage Fracture 3251.50 3251.60 0
2017-10-08 Multi-Stage Fracture 3211.70 3211.80 0
2017-10-08 Multi-Stage Fracture 3184.50 3184.60 0
2017-10-08 Multi-Stage Fracture 3144.70 3144.80 0
2017-10-06 Multi-Stage Fracture 3745.20 3745.30 0
2017-10-08 Multi-Stage Fracture 3117.60 3117.70 0
2017-10-08 Multi-Stage Fracture 3078.00 3078.10 0
2017-10-08 Multi-Stage Fracture 3038.30 3038.40 0
2017-10-08 Multi-Stage Fracture 3011.40 3011.50 0
2017-10-08 Multi-Stage Fracture 2972.20 2972.30 0
2017-10-08 Multi-Stage Fracture 2945.00 2945.10 0
2017-10-08 Multi-Stage Fracture 2905.40 2905.50 0
2017-10-08 Multi-Stage Fracture 2866.10 2866.20 0
2017-10-09 Multi-Stage Fracture 2839.10 2839.20 0
2017-10-09 Multi-Stage Fracture 2799.50 2799.60 0
2017-10-07 Multi-Stage Fracture 3705.40 3705.50 0
2017-10-09 Multi-Stage Fracture 2760.00 2760.10 0
2017-10-09 Multi-Stage Fracture 2732.90 2733.00 0
2017-10-09 Multi-Stage Fracture 2693.40 2693.50 0
2017-10-09 Multi-Stage Fracture 2666.30 2666.40 0
2017-10-09 Multi-Stage Fracture 2627.30 2627.40 0
2017-10-09 Multi-Stage Fracture 2587.90 2588.00 0
2017-10-09 Multi-Stage Fracture 2560.70 2560.80 0
2017-10-09 Multi-Stage Fracture 2520.90 2521.00 0
2017-10-09 Multi-Stage Fracture 2493.80 2493.90 0
2017-10-09 Multi-Stage Fracture 2466.70 2466.80 0
2017-10-07 Multi-Stage Fracture 3665.60 3665.70 0
2017-10-09 Multi-Stage Fracture 2439.60 2439.70 0
2017-10-07 Multi-Stage Fracture 3638.50 3638.60 0
2017-10-07 Multi-Stage Fracture 3598.70 3598.80 0
2017-10-07 Multi-Stage Fracture 3571.60 3571.70 0
2017-10-07 Multi-Stage Fracture 3531.70 3531.80 0
2017-10-07 Multi-Stage Fracture 3491.90 3492.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-06 2017-10-09 2,222 21,512 N/A
2 2017-10-07 2017-10-09 2,222 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.6107 N/A
CARBOECONOPROP 30/50 IS PROPPANT BJ Services Mullite 1302-93-8 100 1.0151 N/A
Silica Crystalline-Cristobalite 14464-46-1 100 1.0151 N/A
Silicon Dioxide. amorphous as glass 7631-86-9 100 1.0151 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.4879 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 0.8383 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0094 N/A
Dibromoacetonitrile 3252-43-5 100 0.0094 N/A
Polyethylene Glycol 25322-68-3 100 0.0094 N/A
Sodium Bromide 7647-15-6 100 0.0094 N/A
Water 7732-18-5 100 0.0094 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0051 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0483 N/A
Non-hazardous Not Available 100 0.0483 N/A
Water 7732-18-5 100 0.0483 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.1083 N/A
Oxyalkylated alcohol 9014 100 0.1083 N/A
Petroleum distillates 64742-47-8 100 0.1083 N/A
Polyacrylate 9014 100 0.1083 N/A
InFlo 73 BJ Services Surfactant Alkoxylated alcohol_2 9969 100 0.0875 N/A
Amine derivative 9969 100 0.0875 N/A
Cyclohexanol 108-93-0 100 0.0875 N/A
Glycerine 56-81-5 100 0.0875 N/A
Pentanol 71-41-0 100 0.0875 N/A
Petroleum distillates 64742-47-8 100 0.0875 N/A
Propylene glycol 57-55-6 100 0.0875 N/A
Urea 57-13-6 100 0.0875 N/A
2 FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.9048 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-20 2017-10-08 Surface Water - Lake 21948

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 960 0.0 0.0 0.0
2018 8469 0.0 0.0 0.0
2019 8513 0.0 0.0 0.0
2020 2056 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-12 Lost Circulation 115.00 116.00
2017-09-13 Lost Circulation 124.00 125.00
2017-09-27 No Incident Encountered 0.00 0.00
2017-10-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References