If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354241402020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.001098,"lon":-113.322751,"icon":""}]} |
Location: 02/02-14-035-24W4/0 | |
Location Alias: 02/02-14-35-24 W4M | |
Location Alias 2: 02/02-14-035-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 24 | |
Section: 14 | |
County/Municipality: Red Deer County | |
Well Name: COPRC HUXLEY 2-14-35-24 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0336111 | |
License Date: 2005-08-10 | |
License Status: Issued | |
Spud Date: 2005-09-02 | |
Final Drill Date: 2005-09-04 | |
Well Total Depth: 672.00 m | |
Surface Hole Latitude: 52.001098 | |
Surface Hole Longitude: -113.322751 |
Date | Event |
---|---|
2005-08-10 | Obtained License |
2005-09-01 | Surface Casing Operation Performed |
2005-09-04 | Finished Drilling |
2005-09-04 | Production Casing Operation Performed |
2005-09-04 | Rig Released |
2005-09-04 | Well Mode changed to Drilled and Cased |
2005-09-05 | Well Log Performed |
2005-09-18 | Well Log Performed |
2005-10-04 | Perforation Treatment Performed - Jet Perforation |
2005-10-07 | Perforation Treatment Performed - Fractured |
2005-10-09 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-10-09 | Well Mode changed to Testing |
2005-10-16 | Well Began Production |
2005-10-16 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-10-16 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-10-04 | Perforation | 615.50 | 616.50 | 13 |
2005-10-04 | Perforation | 474.70 | 475.70 | 13 |
2005-10-04 | Perforation | 477.00 | 478.00 | 13 |
2005-10-04 | Perforation | 490.00 | 491.00 | 13 |
2005-10-04 | Perforation | 515.00 | 516.00 | 13 |
2005-10-04 | Perforation | 520.00 | 521.00 | 13 |
2005-10-04 | Perforation | 527.00 | 528.00 | 13 |
2005-10-04 | Perforation | 536.40 | 538.40 | 13 |
2005-10-04 | Perforation | 565.00 | 566.00 | 13 |
2005-10-04 | Perforation | 593.00 | 594.00 | 13 |
2005-10-04 | Perforation | 604.20 | 606.20 | 13 |
2005-10-04 | Perforation | 622.50 | 623.50 | 13 |
2005-10-04 | Perforation | 612.20 | 613.20 | 13 |
2005-10-07 | Fracture | 622.50 | 623.50 | 0 |
2005-10-07 | Fracture | 612.20 | 616.50 | 0 |
2005-10-07 | Fracture | 604.20 | 606.20 | 0 |
2005-10-07 | Fracture | 593.00 | 594.00 | 0 |
2005-10-07 | Fracture | 565.00 | 566.00 | 0 |
2005-10-07 | Fracture | 536.40 | 538.40 | 0 |
2005-10-07 | Fracture | 527.00 | 528.00 | 0 |
2005-10-07 | Fracture | 515.00 | 521.00 | 0 |
2005-10-07 | Fracture | 490.00 | 491.00 | 0 |
2005-10-04 | Perforation | 238.40 | 240.40 | 13 |
2005-10-07 | Fracture | 474.70 | 478.00 | 0 |
2005-10-07 | Fracture | 424.00 | 425.00 | 0 |
2005-10-07 | Fracture | 417.50 | 418.50 | 0 |
2005-10-07 | Fracture | 353.50 | 354.50 | 0 |
2005-10-07 | Fracture | 248.50 | 249.50 | 0 |
2005-10-07 | Fracture | 238.40 | 240.40 | 0 |
2005-10-04 | Perforation | 248.50 | 249.50 | 13 |
2005-10-04 | Perforation | 353.50 | 354.50 | 13 |
2005-10-04 | Perforation | 369.00 | 370.00 | 13 |
2005-10-04 | Perforation | 375.00 | 376.00 | 13 |
2005-10-04 | Perforation | 417.50 | 418.50 | 13 |
2005-10-04 | Perforation | 424.00 | 425.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2016 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8663 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8752 | 0.0 | 0.0 | 0.0 |
2012 | 8657 | 0.0 | 0.0 | 0.0 |
2013 | 8497 | 0.0 | 0.0 | 0.0 |
2014 | 8611 | 0.0 | 0.0 | 0.0 |
2015 | 8608 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]