X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354233111002

Well Details

Well ID: 0354233111002
Loading map...
Location: 00/11-31-035-23W4/2
Location Alias: 00/11-31-35-23 W4M
Location Alias 2: 00/11-31-035-23 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 23
Section: 31
County/Municipality: Red Deer County
Well Name: EMBER MIKWAN 11-31-35-23
Operator Name: Ember Resources Inc.
License Number: 0352255
License Date: 2006-02-17
License Status: Issued
Spud Date: 2006-02-27
Final Drill Date: 2006-03-05
Well Total Depth: 903.00 m
Surface Hole Latitude: 52.050494
Surface Hole Longitude: -113.284388

For data sources see[1][2]

Well History

Date Event
2006-02-17 Obtained License
2006-02-27 Surface Casing Operation Performed
2006-03-05 Finished Drilling
2006-03-05 Production Casing Operation Performed
2006-03-05 Rig Released
2006-03-05 Well Log Performed
2006-03-05 Well Mode changed to Drilled and Cased
2006-04-20 Perforation Treatment Performed - Jet Perforation
2006-04-20 Well Log Performed
2006-07-06 Perforation Treatment Performed - Fractured
2006-12-21 Well Log Performed
2010-02-19 Perforation Treatment Performed - Jet Perforation
2010-02-20 Perforation Treatment Performed - Fractured
2010-03-01 Well Began Production
2010-03-01 Well Fluid changed to Coalbed Methane-Coals Only
2010-03-01 Well Mode changed to Flowing
2010-03-09 Well Fluid changed to Coalbed Methane-Coals Only
2010-03-09 Well Mode changed to Suspended
2019-01-24 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-04-20 Perforation 584.40 587.40 13
2006-04-20 Perforation 504.40 505.40 13
2006-04-20 Perforation 488.70 489.70 13
2006-04-20 Perforation 474.50 475.50 13
2006-04-20 Perforation 464.00 465.00 13
2006-04-20 Perforation 460.70 461.70 13
2006-04-20 Perforation 438.90 439.90 13
2006-04-20 Perforation 379.90 380.90 13
2006-04-20 Perforation 315.50 316.50 13
2006-04-20 Perforation 306.50 307.50 13
2006-04-20 Perforation 222.00 223.00 13
2006-04-20 Perforation 581.40 584.40 13
2006-07-06 Fracture 222.00 587.40 0
2010-02-19 Perforation 872.80 873.80 13
2010-02-19 Perforation 879.20 880.20 13
2010-02-19 Perforation 875.50 876.50 13
2010-02-20 Fracture 872.80 880.20 0
2010-02-20 Fracture 222.00 587.40 0
2006-04-20 Perforation 571.40 572.40 13
2006-04-20 Perforation 569.00 570.00 13
2006-04-20 Perforation 554.70 555.70 13
2006-04-20 Perforation 544.10 545.10 13
2006-04-20 Perforation 531.60 532.60 13
2006-04-20 Perforation 519.50 520.50 13
2006-04-20 Perforation 508.10 509.10 13

For data sources see[4]



References