X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354231915002

Well Details

Well ID: 0354231915002
Loading map...
Location: 00/15-19-035-23W4/2
Location Alias: 00/15-19-35-23 W4M
Location Alias 2: 00/15-19-035-23 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 23
Section: 19
County/Municipality: Red Deer County
Well Name: EMBER ELNORA 15-19-35-23
Operator Name: Ember Resources Inc.
License Number: 0425359
License Date: 2010-11-01
License Status: Issued
Spud Date: 2010-12-13
Final Drill Date: 2010-12-21
Well Total Depth: 883.00 m
Surface Hole Latitude: 52.022933
Surface Hole Longitude: -113.276601

For data sources see[1][2]

Well History

Date Event
2010-11-01 Obtained License
2010-12-13 Surface Casing Operation Performed
2010-12-21 Finished Drilling
2010-12-21 Production Casing Operation Performed
2010-12-21 Rig Released
2010-12-21 Well Mode changed to Drilled and Cased
2011-01-06 Well Log Performed
2011-02-06 Perforation Treatment Performed - Jet Perforation
2011-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-16 Perforation Treatment Performed - Jet Perforation
2011-02-16 Plug Back Performed
2011-03-06 Perforation Treatment Performed - Fractured
2011-03-09 Well Fluid changed to Coalbed Methane-Coals and Other
2011-03-09 Well Mode changed to Testing
2011-03-13 Well Began Production
2011-03-13 Well Fluid changed to Coalbed Methane-Coals and Other
2011-03-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-06 Perforation 854.00 855.00 13
2011-02-16 Perforation 490.00 492.00 13
2011-02-16 Perforation 381.00 382.00 13
2011-02-16 Perforation 354.60 355.60 13
2011-02-16 Perforation 336.10 337.10 13
2011-02-16 Perforation 305.60 306.10 13
2011-02-16 Perforation 555.20 556.20 13
2011-02-16 Perforation 550.40 551.90 13
2011-02-16 Perforation 564.40 565.40 13
2011-02-16 Perforation 570.20 570.70 13
2011-02-16 Perforation 566.80 567.80 13
2011-02-16 Packing Device Capped w/Cement 844.00 852.00 0
2011-02-16 Perforation 539.60 541.60 13
2011-02-16 Perforation 485.80 488.30 13
2011-02-16 Perforation 467.90 469.90 13
2011-02-16 Perforation 436.90 438.40 13
2011-02-16 Perforation 526.80 527.80 13
2011-02-16 Perforation 514.30 514.80 13
2011-03-06 Fracture 381.00 492.00 0
2011-03-06 Fracture 296.60 556.20 0
2011-03-06 Fracture 564.40 570.70 0
2011-02-16 Perforation 374.90 375.90 13
2011-02-16 Perforation 367.80 368.80 13
2011-02-16 Perforation 364.00 365.00 13
2011-02-16 Perforation 430.40 430.90 13
2011-02-16 Perforation 420.70 421.70 13
2011-02-16 Perforation 414.00 415.00 13
2011-02-16 Perforation 296.60 297.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7003 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8727 0.0 0.0 0.0
2014 8708 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References