X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354231716006

Well Details

Well ID: 0354231716006
Loading map...
Location: 00/16-17-035-23W4/6
Location Alias: 00/16-17-35-23 W4M
Location Alias 2: 00/16-17-035-23 W4/06
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 23
Section: 17
County/Municipality: Red Deer County
Well Name: FORGE ELNORA 16-17-35-23
Operator Name: Forge Oil & Gas Limited
License Number: 0309146
License Date: 2004-05-27
License Status: Issued
Spud Date: 2004-07-14
Final Drill Date: 2004-07-21
Well Total Depth: 1640.00 m
Surface Hole Latitude: 52.009316
Surface Hole Longitude: -113.248713

For data sources see[1][2]

Well History

Date Event
2004-05-27 Obtained License
2004-07-14 Lost Circulation Occurred
2004-07-17 Surface Casing Operation Performed
2004-07-21 Finished Drilling
2004-07-21 Well Mode changed to Drilled and Cased
2004-07-22 Well Log Performed
2004-07-23 Production Casing Operation Performed
2004-07-24 Rig Released
2004-09-05 Perforation Treatment Performed - Jet Perforation
2004-09-05 Well Log Performed
2004-09-18 Perforation Treatment Performed - Fractured
2005-02-08 Perforation Treatment Performed - Fractured
2005-06-12 Perforation Treatment Performed - Jet Perforation
2005-06-12 Well Log Performed
2005-06-28 Perforation Treatment Performed - Fractured
2007-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-18 Perforation Treatment Performed - Jet Perforation
2007-08-18 Plug Back Performed
2007-08-18 Well Log Performed
2007-10-31 Perforation Treatment Performed - Jet Perforation
2007-10-31 Well Log Performed
2009-01-29 Well Log Performed
2010-05-27 Perforation Treatment Performed - Jet Perforation
2010-06-20 Perforation Treatment Performed - Fractured
2010-06-24 Well Structure changed to Commingled
2010-06-26 Well Log Performed
2010-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-25 Plug Back Performed
2010-07-25 Well Structure changed to Commingled
2011-12-16 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-09-05 Perforation 1582.00 1588.00 20
2010-05-27 Perforation 851.20 852.20 17
2010-05-27 Perforation 828.10 829.10 17
2010-05-27 Perforation 595.40 596.40 17
2010-05-27 Perforation 580.80 581.80 17
2010-05-27 Perforation 578.70 579.70 17
2010-05-27 Perforation 577.10 578.10 17
2010-05-27 Perforation 574.00 575.00 17
2010-05-27 Perforation 571.30 572.30 17
2010-05-27 Perforation 558.50 559.50 17
2010-05-27 Perforation 551.20 552.70 17
2004-09-18 Fracture 1582.00 1588.00 0
2010-05-27 Perforation 542.70 543.70 17
2010-05-27 Perforation 537.20 538.20 17
2010-05-27 Perforation 532.50 533.50 17
2010-05-27 Perforation 520.80 521.80 17
2010-05-27 Perforation 493.00 494.00 17
2010-05-27 Perforation 489.70 490.70 17
2010-05-27 Perforation 483.10 483.60 17
2010-05-27 Perforation 478.50 481.00 17
2010-05-27 Perforation 475.20 476.20 17
2010-05-27 Perforation 452.00 454.50 17
2005-02-08 Fracture 1582.00 1588.00 0
2010-05-27 Perforation 450.80 451.80 17
2010-05-27 Perforation 442.90 443.90 17
2010-05-27 Perforation 435.10 436.60 17
2010-05-27 Perforation 429.30 430.30 17
2010-05-27 Perforation 414.80 415.80 17
2010-05-27 Perforation 386.00 387.00 17
2010-05-27 Perforation 376.00 377.00 17
2010-05-27 Perforation 365.80 366.80 17
2010-05-27 Perforation 343.60 344.60 17
2010-05-27 Perforation 308.30 309.80 17
2005-06-12 Perforation 1561.30 1563.30 17
2010-05-27 Perforation 301.40 302.40 17
2010-05-27 Perforation 221.20 222.20 17
2010-06-20 Fracture 828.10 858.10 0
2010-06-20 Fracture 571.30 596.40 0
2010-06-20 Fracture 221.20 559.50 0
2010-07-25 Packing Device Capped w/Cement 1428.80 1436.80 0
2011-12-16 Perforation 1441.00 1451.00 17
2005-06-28 Fracture 1561.30 1563.30 0
2007-08-18 Packing Device Capped w/Cement 1551.00 1559.00 0
2007-08-18 Perforation 1456.50 1457.50 17
2007-10-31 Perforation 1441.00 1451.00 17
2010-05-27 Perforation 857.10 858.10 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-07-14 Lost Circulation 50.00 255.00
2011-12-20 No Incident Encountered 0.00 0.00
2011-12-16 No Incident Encountered 0.00 0.00

For data sources see[5]

References