X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354231405000

Well Details

Well ID: 0354231405000
Loading map...
Location: 00/05-14-035-23W4/0
Location Alias: 00/05-14-35-23 W4M
Location Alias 2: 00/05-14-035-23 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 23
Section: 14
County/Municipality: Red Deer County
Well Name: EMBER ELNORA 5-14-35-23
Operator Name: Ember Resources Inc.
License Number: 0349072
License Date: 2006-01-16
License Status: Issued
Spud Date: 2006-02-22
Final Drill Date: 2006-02-25
Well Total Depth: 947.00 m
Surface Hole Latitude: 52.001149
Surface Hole Longitude: -113.191835

For data sources see[1][2]

Well History

Date Event
2006-01-16 Obtained License
2006-02-23 Surface Casing Operation Performed
2006-02-25 Finished Drilling
2006-02-25 Production Casing Operation Performed
2006-02-25 Well Mode changed to Drilled and Cased
2006-02-26 Rig Released
2006-03-05 Well Log Performed
2006-03-11 Perforation Treatment Performed - Jet Perforation
2006-03-11 Well Log Performed
2006-03-12 Perforation Treatment Performed - Fractured
2006-03-17 Well Began Production
2006-03-17 Well Fluid changed to Coalbed Methane-Coals and Other
2006-03-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-11 Perforation 589.00 589.30 17
2006-03-11 Perforation 537.00 537.80 17
2006-03-11 Perforation 523.70 524.10 17
2006-03-11 Perforation 492.00 493.60 17
2006-03-11 Perforation 486.90 487.20 17
2006-03-11 Perforation 481.10 482.10 17
2006-03-11 Perforation 480.00 480.80 17
2006-03-11 Perforation 479.00 479.50 17
2006-03-11 Perforation 476.30 476.80 17
2006-03-11 Perforation 454.00 455.40 17
2006-03-11 Perforation 446.00 447.50 17
2006-03-11 Perforation 587.90 588.30 17
2006-03-11 Perforation 441.30 441.90 17
2006-03-11 Perforation 435.40 435.70 17
2006-03-11 Perforation 433.10 433.80 17
2006-03-11 Perforation 401.50 401.80 17
2006-03-11 Perforation 396.00 399.00 17
2006-03-11 Perforation 383.00 383.30 17
2006-03-11 Perforation 380.70 381.20 17
2006-03-11 Perforation 370.30 370.80 17
2006-03-11 Perforation 309.00 310.50 17
2006-03-11 Perforation 299.50 300.50 17
2006-03-11 Perforation 585.60 585.90 17
2006-03-12 Fracture 299.50 589.30 0
2006-03-11 Perforation 579.20 579.50 17
2006-03-11 Perforation 575.50 576.00 17
2006-03-11 Perforation 566.80 567.10 17
2006-03-11 Perforation 558.60 559.20 17
2006-03-11 Perforation 554.10 555.90 17
2006-03-11 Perforation 545.90 546.90 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6882 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8594 0.0 0.0 0.0
2011 8751 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 3912 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[5]

References