X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354230306000

Well Details

Well ID: 0354230306000
Loading map...
Location: 00/06-03-035-23W4/0
Location Alias: 00/06-03-35-23 W4M
Location Alias 2: 00/06-03-035-23 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 23
Section: 03
County/Municipality: Red Deer County
Well Name: PINE CLIFF ELNORA 6-3-35-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0140048
License Date: 1989-06-06
License Status: Issued
Spud Date: 1989-07-20
Final Drill Date: 1989-07-27
Well Total Depth: 1717.00 m
Surface Hole Latitude: 51.975036
Surface Hole Longitude: -113.211772

For data sources see[1][2]

Well History

Date Event
1989-06-06 Obtained License
1989-07-21 Lost Circulation Occurred
1989-07-22 Surface Casing Operation Performed
1989-07-25 Lost Circulation Occurred
1989-07-27 Finished Drilling
1989-07-27 Well Log Performed
1989-07-28 Drill Stem Test Performed
1989-07-30 Production Casing Operation Performed
1989-07-30 Rig Released
1989-09-30 Well Log Performed
1989-10-02 Well Log Performed
1989-10-03 Perforation Treatment Performed - Jet Perforation
1989-10-04 Well Log Performed
1989-10-05 Perforation Treatment Performed - Jet Perforation
1989-10-07 Perforation Treatment Performed - Cement Squeeze
1989-10-12 Well Log Performed
1989-10-13 Perforation Treatment Performed - Jet Perforation
1989-10-14 Well Log Performed
1989-10-15 Perforation Treatment Performed - Jet Perforation
1989-10-16 Well Log Performed
1989-10-17 Perforation Treatment Performed - Jet Perforation
1989-10-19 Well Mode changed to Drilled and Cased
1991-08-16 Well Began Production
1991-08-16 Well Fluid changed to Gas
1991-08-16 Well Mode changed to Flowing
2006-01-01 Well Fluid changed to Gas
2006-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-03 Perforation 1644.00 1646.00 13
1989-10-05 Perforation 1641.00 1642.00 13
1989-10-07 Cement Squeeze 1641.00 1646.00 0
1989-10-13 Perforation 1644.00 1646.00 13
1989-10-15 Perforation 1640.00 1643.00 20
1989-10-17 Perforation 1631.00 1638.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 2923 0.0 0.0 0.0
1992 8230 0.0 0.0 0.0
1993 7841 0.0 0.0 0.0
1994 7996 0.0 0.0 0.0
1995 7034 0.0 0.0 0.0
1996 7563 0.0 0.0 0.0
1997 6172 0.0 0.0 0.0
1998 5480 0.0 0.0 0.0
1999 8562 0.0 0.0 0.0
2000 8668 0.0 0.0 0.0
2001 8516 0.0 0.0 0.0
2002 8758 0.0 0.0 0.0
2003 8758 0.0 0.0 0.0
2004 8678 0.0 0.0 0.0
2005 8588 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8544 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8663 0.0 0.0 0.0
2011 8706 0.0 0.0 0.0
2012 8546 0.0 0.0 0.0
2013 8101 0.0 0.0 0.0
2014 8274 0.0 0.0 0.0
2015 7887 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-07-21 Lost Circulation 79.00 247.00
1989-07-25 Lost Circulation 1590.00 1630.00

For data sources see[6]

References