X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354223415020

Well Details

Well ID: 0354223415020
Loading map...
Location: 02/15-34-035-22W4/0
Location Alias: 02/15-34-35-22 W4M
Location Alias 2: 02/15-34-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 34
County/Municipality: Red Deer County
Well Name: EMBER 102 MIKWAN 15-34-35-22
Operator Name: Ember Resources Inc.
License Number: 0352798
License Date: 2006-02-24
License Status: Issued
Spud Date: 2006-03-02
Final Drill Date: 2006-03-05
Well Total Depth: 798.00 m
Surface Hole Latitude: 52.052960
Surface Hole Longitude: -113.060346

For data sources see[1][2]

Well History

Date Event
2006-02-24 Obtained License
2006-03-03 Surface Casing Operation Performed
2006-03-04 Production Casing Operation Performed
2006-03-05 Finished Drilling
2006-03-05 Rig Released
2006-03-05 Well Mode changed to Drilled and Cased
2006-03-13 Well Log Performed
2006-03-23 Perforation Treatment Performed - Jet Perforation
2006-03-23 Well Log Performed
2006-03-28 Perforation Treatment Performed - Jet Perforation
2006-03-28 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-03-28 Plug Back Performed
2006-03-28 Well Log Performed
2006-03-28 Well Mode changed to Abandoned Zone
2008-07-13 Perforation Treatment Performed - Jet Perforation
2008-07-24 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-23 Perforation 778.00 781.00 17
2008-07-13 Perforation 492.80 493.10 13
2008-07-13 Perforation 491.00 491.60 13
2008-07-13 Perforation 468.00 468.50 13
2008-07-13 Perforation 466.70 467.10 13
2008-07-13 Perforation 453.90 455.80 13
2008-07-13 Perforation 450.90 451.40 13
2008-07-13 Perforation 435.10 436.00 13
2008-07-13 Perforation 407.60 409.20 13
2008-07-13 Perforation 396.00 398.00 13
2008-07-13 Perforation 394.50 395.50 13
2006-03-28 Packing Dev Cpd w/Res-Gyp Cem 773.00 776.00 0
2008-07-13 Perforation 393.00 394.00 13
2008-07-13 Perforation 376.20 376.50 13
2008-07-13 Perforation 373.90 374.40 13
2008-07-13 Perforation 370.90 373.00 13
2008-07-13 Perforation 365.00 366.40 13
2008-07-13 Perforation 361.80 362.70 13
2008-07-13 Perforation 360.70 361.00 13
2008-07-13 Perforation 351.90 354.00 13
2008-07-13 Perforation 344.10 344.40 13
2008-07-13 Perforation 313.10 313.80 13
2006-03-28 Perforation 768.00 769.00 17
2008-07-13 Perforation 302.60 302.90 13
2008-07-13 Perforation 295.70 296.90 13
2008-07-24 Fracture 295.70 509.20 0
2006-03-28 Perforation 679.50 680.50 17
2006-03-28 Perforation 672.50 673.50 17
2006-03-28 Perforation 542.50 546.50 17
2006-03-28 Perforation 517.00 519.50 17
2008-07-13 Perforation 508.90 509.20 13
2008-07-13 Perforation 494.10 494.50 13

For data sources see[4]



References