X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354223204000

Well Details

Well ID: 0354223204000
Loading map...
Location: 00/04-32-035-22W4/0
Location Alias: 00/04-32-35-22 W4M
Location Alias 2: 00/04-32-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 32
County/Municipality: Red Deer County
Well Name: EMBER ELNORA 4-32-35-22
Operator Name: Ember Resources Inc.
License Number: 0350714
License Date: 2006-01-31
License Status: Issued
Spud Date: 2006-02-13
Final Drill Date: 2006-02-15
Well Total Depth: 521.80 m
Surface Hole Latitude: 52.044648
Surface Hole Longitude: -113.117870

For data sources see[1][2]

Well History

Date Event
2006-01-31 Obtained License
2006-02-14 Surface Casing Operation Performed
2006-02-15 Finished Drilling
2006-02-15 Well Mode changed to Drilled and Cased
2006-02-16 Production Casing Operation Performed
2006-02-16 Rig Released
2006-02-23 Well Log Performed
2006-03-02 Perforation Treatment Performed - Jet Perforation
2006-03-02 Well Log Performed
2006-03-10 Perforation Treatment Performed - Fractured
2008-09-09 Well Began Production
2008-09-09 Well Fluid changed to Coalbed Methane-Coals and Other
2008-09-09 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-02 Perforation 304.50 306.50 17
2006-03-02 Perforation 397.10 397.90 17
2006-03-02 Perforation 398.50 399.70 17
2006-03-02 Perforation 400.60 401.00 17
2006-03-02 Perforation 415.00 416.00 17
2006-03-02 Perforation 416.50 416.80 17
2006-03-02 Perforation 417.10 419.10 17
2006-03-02 Perforation 422.70 423.10 17
2006-03-02 Perforation 431.50 432.80 17
2006-03-02 Perforation 458.00 458.90 17
2006-03-02 Perforation 471.50 471.80 17
2006-03-02 Perforation 314.90 316.00 17
2006-03-02 Perforation 478.80 480.20 17
2006-03-02 Perforation 486.60 486.90 17
2006-03-02 Perforation 488.70 489.00 17
2006-03-02 Perforation 492.50 493.00 17
2006-03-02 Perforation 513.50 514.00 17
2006-03-10 Fracture 304.50 514.00 0
2006-03-02 Perforation 331.40 332.30 17
2006-03-02 Perforation 357.50 360.00 17
2006-03-02 Perforation 378.60 378.90 17
2006-03-02 Perforation 379.80 380.70 17
2006-03-02 Perforation 382.80 384.00 17
2006-03-02 Perforation 388.40 389.00 17
2006-03-02 Perforation 391.10 391.90 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2679 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8589 0.0 0.0 0.0
2011 8662 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 4338 0.0 0.0 0.0
2020 2095 0.0 0.0 0.0

For data sources see[5]

References