If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354222812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.037389,"lon":-113.094084,"icon":""}]} |
Location: 00/12-28-035-22W4/0 | |
Location Alias: 00/12-28-35-22 W4M | |
Location Alias 2: 00/12-28-035-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 22 | |
Section: 28 | |
County/Municipality: Red Deer County | |
Well Name: EMBER ELNORA 12-28-35-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0346379 | |
License Date: 2005-12-21 | |
License Status: Issued | |
Spud Date: 2006-05-20 | |
Final Drill Date: 2006-05-21 | |
Well Total Depth: 616.00 m | |
Surface Hole Latitude: 52.037389 | |
Surface Hole Longitude: -113.094084 |
Date | Event |
---|---|
2005-12-21 | Obtained License |
2006-05-20 | Surface Casing Operation Performed |
2006-05-21 | Finished Drilling |
2006-05-21 | Production Casing Operation Performed |
2006-05-21 | Well Mode changed to Drilled and Cased |
2006-05-22 | Rig Released |
2006-06-29 | Well Log Performed |
2006-09-05 | Perforation Treatment Performed - Jet Perforation |
2006-09-05 | Perforation Treatment Performed - Remedial Casing |
2006-09-08 | Perforation Treatment Performed - Jet Perforation |
2006-09-09 | Perforation Treatment Performed - Fractured |
2009-11-19 | Well Began Production |
2009-11-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-05 | Perforation | 150.00 | 150.60 | 72 |
2006-09-08 | Perforation | 449.80 | 450.50 | 14 |
2006-09-08 | Perforation | 446.30 | 447.00 | 14 |
2006-09-08 | Perforation | 443.90 | 444.40 | 14 |
2006-09-08 | Perforation | 424.80 | 425.30 | 14 |
2006-09-08 | Perforation | 422.00 | 424.00 | 14 |
2006-09-08 | Perforation | 417.00 | 417.50 | 14 |
2006-09-08 | Perforation | 412.70 | 413.20 | 14 |
2006-09-08 | Perforation | 409.00 | 409.70 | 14 |
2006-09-08 | Perforation | 403.00 | 403.50 | 14 |
2006-09-08 | Perforation | 401.20 | 401.50 | 14 |
2006-09-05 | Remedial Casing Cementing | 150.00 | 150.60 | 0 |
2006-09-08 | Perforation | 356.20 | 357.20 | 14 |
2006-09-08 | Perforation | 341.10 | 341.50 | 14 |
2006-09-08 | Perforation | 330.80 | 331.90 | 14 |
2006-09-08 | Perforation | 305.00 | 305.70 | 14 |
2006-09-08 | Perforation | 279.50 | 280.20 | 14 |
2006-09-08 | Perforation | 185.40 | 186.20 | 14 |
2006-09-08 | Perforation | 182.90 | 183.10 | 14 |
2006-09-08 | Perforation | 172.80 | 173.00 | 14 |
2006-09-08 | Perforation | 165.70 | 167.00 | 14 |
2006-09-09 | Fracture | 547.80 | 548.20 | 0 |
2006-09-08 | Perforation | 547.80 | 548.20 | 14 |
2006-09-09 | Fracture | 545.80 | 546.40 | 0 |
2006-09-09 | Fracture | 520.30 | 520.60 | 0 |
2006-09-09 | Fracture | 504.50 | 505.50 | 0 |
2006-09-09 | Fracture | 496.50 | 497.00 | 0 |
2006-09-09 | Fracture | 484.50 | 485.10 | 0 |
2006-09-09 | Fracture | 458.90 | 459.60 | 0 |
2006-09-09 | Fracture | 449.80 | 450.50 | 0 |
2006-09-09 | Fracture | 446.30 | 447.00 | 0 |
2006-09-09 | Fracture | 443.90 | 444.40 | 0 |
2006-09-09 | Fracture | 424.80 | 425.30 | 0 |
2006-09-08 | Perforation | 545.80 | 546.40 | 14 |
2006-09-09 | Fracture | 422.00 | 424.00 | 0 |
2006-09-09 | Fracture | 417.00 | 417.50 | 0 |
2006-09-09 | Fracture | 412.70 | 413.20 | 0 |
2006-09-09 | Fracture | 409.00 | 409.70 | 0 |
2006-09-09 | Fracture | 403.00 | 403.50 | 0 |
2006-09-09 | Fracture | 401.20 | 401.50 | 0 |
2006-09-09 | Fracture | 356.20 | 357.20 | 0 |
2006-09-09 | Fracture | 341.10 | 341.50 | 0 |
2006-09-09 | Fracture | 330.80 | 331.90 | 0 |
2006-09-09 | Fracture | 305.00 | 305.70 | 0 |
2006-09-08 | Perforation | 520.30 | 520.60 | 14 |
2006-09-09 | Fracture | 279.50 | 280.20 | 0 |
2006-09-09 | Fracture | 185.40 | 186.20 | 0 |
2006-09-09 | Fracture | 182.90 | 183.10 | 0 |
2006-09-08 | Perforation | 504.50 | 505.50 | 14 |
2006-09-08 | Perforation | 496.50 | 497.00 | 14 |
2006-09-08 | Perforation | 484.50 | 485.10 | 14 |
2006-09-08 | Perforation | 458.90 | 459.60 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 951 | 0.0 | 0.0 | 0.0 |
2010 | 7783 | 0.0 | 0.0 | 0.0 |
2011 | 8567 | 0.0 | 0.0 | 0.0 |
2012 | 8735 | 0.0 | 0.0 | 0.0 |
2013 | 8723 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 3884 | 0.0 | 0.0 | 0.0 |
2020 | 2001 | 0.0 | 0.0 | 0.0 |
For data sources see[5]