X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354222602000

Well Details

Well ID: 0354222602000
Loading map...
Location: 00/02-26-035-22W4/0
Location Alias: 00/02-26-35-22 W4M
Location Alias 2: 00/02-26-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 26
County/Municipality: Red Deer County
Well Name: EMBER SD ELNORA 2-26-35-22
Operator Name: Ember Resources Inc.
License Number: 0432519
License Date: 2011-03-22
License Status: Issued
Spud Date: 2012-02-04
Final Drill Date: 2012-02-05
Well Total Depth: 865.00 m
Surface Hole Latitude: 52.027530
Surface Hole Longitude: -113.039314

For data sources see[1][2]

Well History

Date Event
2011-03-22 Obtained License
2012-02-04 Direction Drilling Operation Performed - Deviate
2012-02-04 Surface Casing Operation Performed
2012-02-05 Finished Drilling
2012-02-05 Production Casing Operation Performed
2012-02-05 Rig Released
2012-02-05 Well Mode changed to Drilled and Cased
2012-02-15 Well Log Performed
2012-02-25 Perforation Treatment Performed - Jet Perforation
2012-02-28 Perforation Treatment Performed - Fractured
2012-03-05 Well Began Production
2012-03-05 Well Fluid changed to Coalbed Methane-Coals and Other
2012-03-05 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-04 Precision Drilling Corporation 239 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-04 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-25 Perforation 311.90 312.40 13
2012-02-25 Perforation 423.60 424.10 13
2012-02-25 Perforation 425.10 426.10 13
2012-02-25 Perforation 427.40 429.40 13
2012-02-25 Perforation 433.40 433.90 13
2012-02-25 Perforation 435.60 437.60 13
2012-02-25 Perforation 456.50 457.00 13
2012-02-25 Perforation 458.70 460.70 13
2012-02-25 Perforation 461.30 461.80 13
2012-02-25 Perforation 462.50 464.00 13
2012-02-25 Perforation 472.50 474.60 13
2012-02-25 Perforation 349.50 352.50 13
2012-02-25 Perforation 498.70 499.70 13
2012-02-25 Perforation 511.30 511.80 13
2012-02-25 Perforation 517.20 518.20 13
2012-02-25 Perforation 534.40 534.90 13
2012-02-25 Perforation 574.40 574.90 13
2012-02-25 Perforation 593.50 596.50 13
2012-02-25 Perforation 820.30 820.80 13
2012-02-25 Perforation 828.50 830.00 13
2012-02-25 Perforation 832.00 834.00 13
2012-02-25 Perforation 836.10 837.10 13
2012-02-25 Perforation 352.50 355.50 13
2012-02-25 Perforation 836.70 837.70 13
2012-02-28 Fracture 311.90 837.70 0
2012-02-25 Perforation 363.00 363.50 13
2012-02-25 Perforation 376.70 377.20 13
2012-02-25 Perforation 379.00 381.00 13
2012-02-25 Perforation 385.40 385.90 13
2012-02-25 Perforation 404.70 405.70 13
2012-02-25 Perforation 420.40 421.40 13

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7125 0.0 0.0 0.0
2013 8658 0.0 0.0 0.0
2014 6475 0.0 0.0 0.0
2015 5111 0.0 0.0 0.0
2016 8677 0.0 0.0 0.0
2017 8695 0.0 0.0 0.0
2018 8564 0.0 0.0 0.0
2019 8278 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[7]

References