X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354222310000

Well Details

Well ID: 0354222310000
Loading map...
Location: 00/10-23-035-22W4/0
Location Alias: 00/10-23-35-22 W4M
Location Alias 2: 00/10-23-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 23
County/Municipality: Red Deer County
Well Name: EMBER SD ELNORA 10-23-35-22
Operator Name: Ember Resources Inc.
License Number: 0433202
License Date: 2011-04-29
License Status: Issued
Spud Date: 2012-02-02
Final Drill Date: 2012-02-03
Well Total Depth: 1106.00 m
Surface Hole Latitude: 52.027720
Surface Hole Longitude: -113.039694

For data sources see[1][2]

Well History

Date Event
2011-04-29 Obtained License
2012-02-02 Direction Drilling Operation Performed - Deviate
2012-02-02 Surface Casing Operation Performed
2012-02-03 Finished Drilling
2012-02-03 Production Casing Operation Performed
2012-02-03 Rig Released
2012-02-03 Well Mode changed to Drilled and Cased
2012-02-15 Well Log Performed
2012-02-24 Perforation Treatment Performed - Jet Perforation
2012-02-28 Perforation Treatment Performed - Fractured
2012-03-05 Well Began Production
2012-03-05 Well Fluid changed to Coalbed Methane-Coals and Other
2012-03-05 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-02 Precision Drilling Corporation 239 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-02 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-24 Perforation 347.00 347.50 13
2012-02-24 Perforation 540.40 542.40 13
2012-02-24 Perforation 547.40 547.90 13
2012-02-24 Perforation 550.60 553.10 13
2012-02-24 Perforation 577.40 577.90 13
2012-02-24 Perforation 580.40 582.90 13
2012-02-24 Perforation 584.50 586.00 13
2012-02-24 Perforation 598.40 600.40 13
2012-02-24 Perforation 635.20 636.70 13
2012-02-24 Perforation 651.10 652.10 13
2012-02-24 Perforation 658.90 659.90 13
2012-02-24 Perforation 358.60 359.10 13
2012-02-24 Perforation 675.70 676.20 13
2012-02-24 Perforation 682.50 683.00 13
2012-02-24 Perforation 739.20 739.70 13
2012-02-24 Perforation 741.00 742.00 13
2012-02-24 Perforation 759.00 760.50 13
2012-02-24 Perforation 779.00 782.50 13
2012-02-24 Perforation 934.00 937.00 13
2012-02-24 Perforation 1025.10 1025.60 13
2012-02-24 Perforation 1032.10 1033.10 13
2012-02-24 Perforation 1033.60 1034.60 13
2012-02-24 Perforation 387.50 388.00 13
2012-02-28 Fracture 347.00 1034.60 0
2012-02-24 Perforation 414.50 416.50 13
2012-02-24 Perforation 416.00 419.00 13
2012-02-24 Perforation 449.10 449.60 13
2012-02-24 Perforation 508.30 509.30 13
2012-02-24 Perforation 526.20 528.20 13
2012-02-24 Perforation 529.70 530.20 13

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7149 0.0 0.0 0.0
2013 8490 0.0 0.0 0.0
2014 8652 0.0 0.0 0.0
2015 8715 0.0 0.0 0.0
2016 8653 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8564 0.0 0.0 0.0
2019 8278 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[7]

References