X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354222012002

Well Details

Well ID: 0354222012002
Loading map...
Location: 00/12-20-035-22W4/2
Location Alias: 00/12-20-35-22 W4M
Location Alias 2: 00/12-20-035-22 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 20
County/Municipality: Red Deer County
Well Name: EMBER ELNORA 12-20-35-22
Operator Name: Ember Resources Inc.
License Number: 0339195
License Date: 2005-10-03
License Status: Amended
Spud Date: 2005-10-16
Final Drill Date: 2005-10-18
Well Total Depth: 873.00 m
Surface Hole Latitude: 52.022519
Surface Hole Longitude: -113.118450

For data sources see[1][2]

Well History

Date Event
2005-03-21 Well Log Performed
2005-10-03 Obtained License
2005-10-17 Surface Casing Operation Performed
2005-10-18 Finished Drilling
2005-10-18 Well Mode changed to Drilled and Cased
2005-10-19 Production Casing Operation Performed
2005-10-19 Rig Released
2005-11-22 Well Log Performed
2005-12-01 Perforation Treatment Performed - Jet Perforation
2005-12-01 Well Log Performed
2005-12-02 Perforation Treatment Performed - Cement Squeeze
2005-12-02 Perforation Treatment Performed - Jet Perforation
2005-12-02 Well Log Performed
2005-12-04 Perforation Treatment Performed - Jet Perforation
2005-12-04 Well Log Performed
2005-12-07 Perforation Treatment Performed - Cement Squeeze
2005-12-07 Well Log Performed
2005-12-08 Perforation Treatment Performed - Jet Perforation
2005-12-09 Perforation Treatment Performed - Cement Squeeze
2005-12-10 Perforation Treatment Performed - Jet Perforation
2005-12-10 Well Log Performed
2005-12-11 Perforation Treatment Performed - Cement Squeeze
2005-12-17 Well Log Performed
2006-03-01 Well Log Performed
2006-03-21 Perforation Treatment Performed - Jet Perforation
2006-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-24 Perforation Treatment Performed - Jet Perforation
2006-03-24 Plug Back Performed
2006-03-24 Well Log Performed
2006-09-12 Well Began Production
2006-09-12 Well Fluid changed to Coalbed Methane-Coals Only
2006-09-12 Well Mode changed to Flowing
2006-11-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-01 Perforation 557.00 558.00 20
2005-12-09 Cement Squeeze 330.00 331.00 0
2005-12-10 Perforation 310.00 311.00 13
2005-12-10 Perforation 299.00 300.00 13
2005-12-11 Cement Squeeze 299.00 311.00 0
2006-03-21 Perforation 772.50 775.00 17
2006-03-21 Perforation 769.50 770.50 17
2006-03-24 Packing Device Capped w/Cement 759.00 767.00 0
2006-03-24 Perforation 520.80 521.20 17
2006-03-24 Perforation 515.60 515.90 17
2006-03-24 Perforation 512.80 513.20 17
2005-12-02 Perforation 449.00 450.00 20
2006-03-24 Perforation 487.60 488.00 17
2006-03-24 Perforation 482.10 482.40 17
2006-03-24 Perforation 470.80 472.00 17
2006-03-24 Perforation 465.10 465.40 17
2006-03-24 Perforation 454.30 454.60 17
2006-03-24 Perforation 452.40 453.00 17
2006-03-24 Perforation 443.90 444.70 17
2006-03-24 Perforation 426.10 427.10 17
2006-03-24 Perforation 418.70 419.00 17
2006-03-24 Perforation 416.30 417.00 17
2005-12-02 Cement Squeeze 557.00 558.00 0
2006-03-24 Perforation 409.80 412.20 17
2006-03-24 Perforation 392.80 393.20 17
2006-03-24 Perforation 391.80 392.20 17
2006-03-24 Perforation 388.70 389.30 17
2006-03-24 Perforation 381.40 382.10 17
2006-03-24 Perforation 374.30 374.90 17
2006-03-24 Perforation 370.70 371.10 17
2006-03-24 Perforation 364.00 364.30 17
2006-03-24 Perforation 360.30 360.80 17
2006-03-24 Perforation 353.00 353.30 17
2005-12-04 Perforation 532.00 533.00 20
2006-03-24 Perforation 336.90 337.20 17
2006-03-24 Perforation 323.30 323.60 17
2006-03-24 Perforation 304.50 305.00 17
2006-11-17 Fracture 304.50 521.20 0
2005-12-07 Cement Squeeze 532.00 533.00 0
2005-12-07 Cement Squeeze 449.00 450.00 0
2005-12-08 Perforation 431.00 432.00 13
2005-12-08 Perforation 330.00 331.00 13
2005-12-09 Cement Squeeze 431.00 432.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1477 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8679 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8647 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8723 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 4342 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References