If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354212912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.032151,"lon":-112.976512,"icon":""}]} |
Location: 00/12-29-035-21W4/0 | |
Location Alias: 00/12-29-35-21 W4M | |
Location Alias 2: 00/12-29-035-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 21 | |
Section: 29 | |
County/Municipality: Red Deer County | |
Well Name: EMBER SD RICH 12-29-35-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420430 | |
License Date: 2010-05-14 | |
License Status: Amended | |
Spud Date: 2010-10-03 | |
Final Drill Date: 2010-10-04 | |
Well Total Depth: 923.00 m | |
Surface Hole Latitude: 52.032151 | |
Surface Hole Longitude: -112.976512 |
Date | Event |
---|---|
2010-05-14 | Obtained License |
2010-10-03 | Direction Drilling Operation Performed - Deviate |
2010-10-03 | Surface Casing Operation Performed |
2010-10-04 | Finished Drilling |
2010-10-04 | Production Casing Operation Performed |
2010-10-04 | Rig Released |
2010-10-04 | Well Mode changed to Drilled and Cased |
2010-10-13 | Well Log Performed |
2010-10-27 | Perforation Treatment Performed - Jet Perforation |
2010-10-28 | Perforation Treatment Performed - Jet Perforation |
2010-11-25 | Perforation Treatment Performed - Fractured |
2010-12-06 | Well Began Production |
2010-12-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-06 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-03 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-27 | Perforation | 434.00 | 439.50 | 13 |
2010-10-27 | Perforation | 559.20 | 560.20 | 13 |
2010-10-27 | Perforation | 546.20 | 547.20 | 13 |
2010-10-27 | Perforation | 596.80 | 597.80 | 13 |
2010-10-27 | Perforation | 577.90 | 578.90 | 13 |
2010-10-27 | Perforation | 513.80 | 515.30 | 13 |
2010-10-27 | Perforation | 542.60 | 543.60 | 13 |
2010-10-28 | Perforation | 255.50 | 256.00 | 13 |
2010-10-28 | Perforation | 300.70 | 301.70 | 13 |
2010-10-28 | Perforation | 253.90 | 254.40 | 13 |
2010-10-28 | Perforation | 317.50 | 319.00 | 13 |
2010-10-27 | Perforation | 430.30 | 433.80 | 13 |
2010-10-28 | Perforation | 899.00 | 901.00 | 13 |
2010-10-28 | Perforation | 361.00 | 363.00 | 13 |
2010-10-28 | Perforation | 364.80 | 366.80 | 13 |
2010-10-28 | Perforation | 390.60 | 392.60 | 13 |
2010-10-28 | Perforation | 386.70 | 388.70 | 13 |
2010-10-28 | Perforation | 392.90 | 393.40 | 13 |
2010-10-28 | Perforation | 903.70 | 905.20 | 13 |
2010-10-28 | Perforation | 399.90 | 401.40 | 13 |
2010-10-28 | Perforation | 368.50 | 369.50 | 13 |
2010-10-28 | Perforation | 384.10 | 386.60 | 13 |
2010-10-27 | Perforation | 496.10 | 498.10 | 13 |
2010-10-28 | Perforation | 377.00 | 378.00 | 13 |
2010-11-25 | Fracture | 472.00 | 473.00 | 0 |
2010-11-25 | Fracture | 418.00 | 421.00 | 0 |
2010-11-25 | Fracture | 899.00 | 901.00 | 0 |
2010-11-25 | Fracture | 317.50 | 363.00 | 0 |
2010-11-25 | Fracture | 427.50 | 428.50 | 0 |
2010-11-25 | Fracture | 300.70 | 301.70 | 0 |
2010-11-25 | Fracture | 493.20 | 515.00 | 0 |
2010-11-25 | Fracture | 542.60 | 597.80 | 0 |
2010-11-25 | Fracture | 364.80 | 401.40 | 0 |
2010-10-27 | Perforation | 493.20 | 494.20 | 13 |
2010-10-27 | Perforation | 443.00 | 444.00 | 13 |
2010-10-27 | Perforation | 472.00 | 473.00 | 13 |
2010-10-27 | Perforation | 427.50 | 428.50 | 13 |
2010-10-27 | Perforation | 418.00 | 421.00 | 13 |
2010-10-27 | Perforation | 505.70 | 506.20 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 624 | 0.0 | 0.0 | 0.0 |
2011 | 8656 | 0.0 | 0.0 | 0.0 |
2012 | 8613 | 0.0 | 0.0 | 0.0 |
2013 | 8504 | 0.0 | 0.0 | 0.0 |
2014 | 8662 | 0.0 | 0.0 | 0.0 |
2015 | 8666 | 0.0 | 0.0 | 0.0 |
2016 | 8676 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8656 | 0.0 | 0.0 | 0.0 |
2019 | 8704 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[6]