If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354212404002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.014863,"lon":-112.880549,"icon":""}]} |
Location: 00/04-24-035-21W4/2 | |
Location Alias: 00/04-24-35-21 W4M | |
Location Alias 2: 00/04-24-035-21 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 21 | |
Section: 24 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER RICH 4-24-35-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0348252 | |
License Date: 2006-01-10 | |
License Status: Issued | |
Spud Date: 2006-01-25 | |
Final Drill Date: 2006-01-27 | |
Well Total Depth: 718.00 m | |
Surface Hole Latitude: 52.014863 | |
Surface Hole Longitude: -112.880549 |
Date | Event |
---|---|
2006-01-10 | Obtained License |
2006-01-26 | Surface Casing Operation Performed |
2006-01-27 | Finished Drilling |
2006-01-27 | Production Casing Operation Performed |
2006-01-27 | Well Mode changed to Drilled and Cased |
2006-01-28 | Rig Released |
2006-02-05 | Well Log Performed |
2006-02-11 | Perforation Treatment Performed - Jet Perforation |
2006-02-11 | Well Log Performed |
2007-10-11 | Perforation Treatment Performed - Jet Perforation |
2007-10-11 | Well Log Performed |
2007-10-18 | Perforation Treatment Performed - Fractured |
2007-10-21 | Well Structure changed to Commingled |
2008-09-19 | Well Began Production |
2008-09-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-09-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-11 | Perforation | 555.00 | 557.50 | 17 |
2007-10-11 | Perforation | 374.90 | 376.10 | 13 |
2007-10-11 | Perforation | 373.20 | 373.50 | 13 |
2007-10-11 | Perforation | 371.50 | 372.10 | 13 |
2007-10-11 | Perforation | 356.70 | 357.20 | 13 |
2007-10-11 | Perforation | 333.20 | 335.20 | 13 |
2007-10-11 | Perforation | 327.00 | 330.00 | 13 |
2007-10-11 | Perforation | 320.70 | 321.80 | 13 |
2007-10-11 | Perforation | 316.30 | 318.00 | 13 |
2007-10-11 | Perforation | 316.30 | 318.00 | 13 |
2007-10-11 | Perforation | 314.20 | 314.80 | 13 |
2006-02-11 | Perforation | 457.00 | 460.00 | 17 |
2007-10-11 | Perforation | 311.40 | 313.20 | 13 |
2007-10-11 | Perforation | 310.60 | 311.10 | 13 |
2007-10-11 | Perforation | 294.60 | 294.90 | 13 |
2007-10-11 | Perforation | 290.40 | 292.20 | 13 |
2007-10-11 | Perforation | 288.70 | 289.00 | 13 |
2007-10-11 | Perforation | 272.50 | 272.80 | 13 |
2007-10-11 | Perforation | 265.60 | 269.60 | 13 |
2007-10-11 | Perforation | 262.10 | 263.10 | 13 |
2007-10-11 | Perforation | 244.20 | 244.70 | 13 |
2007-10-11 | Perforation | 235.70 | 236.70 | 13 |
2006-02-11 | Perforation | 442.50 | 444.00 | 17 |
2007-10-11 | Perforation | 224.20 | 224.70 | 13 |
2007-10-11 | Perforation | 207.00 | 208.00 | 13 |
2007-10-18 | Fracture | 207.00 | 434.90 | 0 |
2007-10-11 | Perforation | 434.60 | 434.90 | 13 |
2007-10-11 | Perforation | 431.70 | 432.00 | 13 |
2007-10-11 | Perforation | 421.70 | 422.00 | 13 |
2007-10-11 | Perforation | 420.00 | 420.30 | 13 |
2007-10-11 | Perforation | 396.00 | 401.00 | 13 |
2007-10-11 | Perforation | 388.90 | 389.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 2895 | 0.0 | 0.0 | 0.0 |
2009 | 8694 | 0.0 | 0.0 | 0.0 |
2010 | 8696 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]