X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202611000

Well Details

Well ID: 0354202611000
Loading map...
Location: 00/11-26-035-20W4/0
Location Alias: 00/11-26-35-20 W4M
Location Alias 2: 00/11-26-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 26
County/Municipality: County of Stettler No. 6
Well Name: IMP HB FENNBV 11-26-35-20
Operator Name: Imperial Oil Resources Limited
License Number: 0007088
License Date: 1953-09-23
License Status: Re-Entered
Spud Date: 1953-09-29
Final Drill Date: 1953-10-20
Well Total Depth: 1626.10 m
Surface Hole Latitude: 52.036127
Surface Hole Longitude: -112.758913

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-23 Obtained License
1953-10-20 Finished Drilling
1953-10-20 Well Mode changed to Drilled and Cased
1953-10-21 Perforation Treatment Performed - Open-Hole Completion
1953-10-21 Production Casing Operation Performed
1953-11-01 Well Began Production
1953-11-01 Well Fluid changed to Crude Oil
1953-11-01 Well Mode changed to Flowing
1974-02-26 Well Fluid changed to Crude Oil
1974-02-26 Well Mode changed to Pumping
1979-08-24 Perforation Treatment Performed - Jet Perforation
1979-08-24 Well Log Performed
1979-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-27 Perforation Treatment Performed - Cement Plug
1979-08-27 Perforation Treatment Performed - Open-Hole Completion
1982-11-03 Perforation Treatment Performed - Cement Plug
1982-11-03 Perforation Treatment Performed - Open-Hole Completion
1987-12-01 Well Fluid changed to Crude Oil
1987-12-01 Well Mode changed to Suspended
1989-08-08 Well Fluid changed to Crude Oil
1989-08-08 Well Mode changed to Pumping
1989-10-20 Well Fluid changed to Crude Oil
1989-10-20 Well Mode changed to Suspended
1990-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-08 Plug Back Performed
1990-10-08 Well Fluid changed to Crude Oil
1990-10-08 Well Mode changed to Abandoned
1990-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-09 Perforation Treatment Performed - Jet Perforation
1990-10-09 Perforation Treatment Performed - Remedial Casing
1990-10-09 Well Log Performed
1990-11-01 Well Abandoned
1998-07-17 Well Fluid changed to Crude Oil
1998-07-17 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-21 Open Hole/Barefoot Completion 1612.40 1626.10 0
1990-10-09 Perforation 233.00 233.50 7
1990-10-09 Remedial Casing Cementing 233.00 233.50 0
1979-08-24 Perforation 1609.30 1612.30 7
1979-08-27 Acid Treatment 1609.30 1612.30 0
1979-08-27 Cement Plug 1614.50 1618.20 0
1979-08-27 Open Hole/Barefoot Completion 1612.40 1614.50 0
1982-11-03 Cement Plug 1613.00 1614.50 0
1982-11-03 Open Hole/Barefoot Completion 1612.40 1613.00 0
1990-10-08 Packing Device Capped w/Cement 1592.00 1600.00 0
1990-10-09 Packing Device Capped w/Cement 896.00 904.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 1926 0.0 0.0 0.0
1974 6349 0.0 0.0 0.0
1975 4331 0.0 0.0 0.0
1976 4358 0.0 0.0 0.0
1977 5312 0.0 0.0 0.0
1978 4867 0.0 0.0 0.0
1979 5741 0.0 0.0 0.0
1980 5591 0.0 0.0 0.0
1981 7095 0.0 0.0 0.0
1982 3030 0.0 0.0 0.0
1987 976 0.0 0.0 0.0
1989 1223 0.0 0.0 0.0

For data sources see[5]

References