X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202307000

Well Details

Well ID: 0354202307000
Loading map...
Location: 00/07-23-035-20W4/0
Location Alias: 00/07-23-35-20 W4M
Location Alias 2: 00/07-23-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: CPR CONNOR NO 7
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0008163
License Date: 1954-06-28
License Status: RecCertified
Spud Date: 1954-07-10
Final Drill Date: 1954-07-24
Well Total Depth: 1634.30 m
Surface Hole Latitude: 52.017332
Surface Hole Longitude: -112.752054

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-28 Obtained License
1954-07-24 Finished Drilling
1954-07-24 Well Mode changed to Drilled and Cased
1954-07-26 Production Casing Operation Performed
1954-07-28 Perforation Treatment Performed - Open-Hole Completion
1954-07-29 Well Began Production
1954-07-29 Well Fluid changed to Crude Oil
1954-07-29 Well Mode changed to Flowing
1973-03-20 Perforation Treatment Performed - Cement Plug
1973-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1974-03-20 Well Fluid changed to Crude Oil
1974-03-20 Well Mode changed to Pumping
1975-03-20 Perforation Treatment Performed - Cement Squeeze
1975-03-21 Perforation Treatment Performed - Jet Perforation
1975-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-12 Perforation Treatment Performed - Cement Squeeze
1983-02-17 Perforation Treatment Performed - Jet Perforation
1983-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-19 Perforation Treatment Performed - Jet Perforation
1984-05-23 Perforation Treatment Performed - Cement Squeeze
1984-05-23 Well Log Performed
1984-05-24 Perforation Treatment Performed - Jet Perforation
1984-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-14 Perforation Treatment Performed - Cement Squeeze
1984-07-14 Perforation Treatment Performed - Jet Perforation
1984-07-16 Well Log Performed
1984-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-18 Perforation Treatment Performed - Jet Perforation
1984-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-19 Well Log Performed
1984-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-20 Perforation Treatment Performed - Jet Perforation
1986-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-11 Plug Back Performed
1986-12-11 Well Fluid changed to Crude Oil
1986-12-11 Well Mode changed to Abandoned Zone
1989-05-24 Well Log Performed
1996-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-11 Perforation Treatment Performed - Jet Perforation
1996-02-11 Plug Back Performed
1996-02-21 Perforation Treatment Performed - Remedial Casing
1996-02-22 Perforation Treatment Performed - Jet Perforation
1996-02-22 Perforation Treatment Performed - Remedial Casing
1996-05-14 Well Abandoned
1996-05-14 Well Fluid changed to Crude Oil
1996-05-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-28 Open Hole/Barefoot Completion 1622.10 1634.30 0
1983-02-19 Perforation 1613.60 1615.50 13
1983-02-19 Acid Treatment 1612.00 1615.50 0
1984-05-23 Cement Squeeze 1612.00 1615.50 0
1984-05-24 Perforation 1613.30 1614.60 13
1984-05-25 Acid Treatment 1613.30 1614.60 0
1984-07-14 Acid Treatment 1613.30 1614.60 0
1984-07-14 Cement Squeeze 1613.30 1614.60 0
1984-07-14 Perforation 1614.80 1617.40 6
1984-07-18 Perforation 1613.30 1614.60 13
1984-07-18 Acid Treatment 1613.30 1617.40 0
1973-03-20 Cement Plug 1626.10 1634.30 0
1984-07-19 Acid Treatment 1613.30 1617.40 0
1984-07-20 Perforation 1614.40 1615.90 13
1984-07-20 Acid Treatment 1614.40 1615.90 0
1986-12-11 Packing Device Capped w/Cement 1597.00 1605.00 0
1996-02-11 Packing Device Capped w/Cement 1190.00 1198.00 0
1996-02-11 Perforation 321.00 322.00 13
1996-02-21 Remedial Casing Cementing 321.00 322.00 0
1996-02-22 Perforation 317.50 318.50 13
1996-02-22 Remedial Casing Cementing 317.50 318.50 0
1973-03-21 Acid Wash 1622.10 1626.10 0
1975-03-20 Cement Squeeze 1622.10 1626.10 0
1975-03-21 Perforation 1615.40 1617.60 13
1975-03-22 Acid Treatment 1615.40 1617.60 0
1983-02-12 Cement Squeeze 1615.40 1617.60 0
1983-02-17 Perforation 1612.00 1613.20 13
1983-02-18 Acid Treatment 1612.00 1613.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6330 0.0 0.0 0.0
1968 5752 0.0 0.0 0.0
1969 6711 0.0 0.0 0.0
1970 6136 0.0 0.0 0.0
1971 6923 0.0 0.0 0.0
1972 7218 0.0 0.0 0.0
1973 7195 0.0 0.0 0.0
1974 6318 0.0 0.0 0.0
1975 7263 0.0 0.0 0.0
1976 6316 0.0 0.0 0.0
1977 5376 0.0 0.0 0.0
1978 6456 0.0 0.0 0.0
1979 8603 0.0 0.0 0.0
1980 6992 0.0 0.0 0.0
1981 8742 0.0 0.0 0.0
1982 8020 0.0 0.0 0.0
1983 8299 0.0 0.0 0.0
1984 6995 0.0 0.0 0.0
1985 8757 0.0 0.0 0.0
1986 3001 0.0 0.0 0.0

For data sources see[5]

References