X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202306002

Well Details

Well ID: 0354202306002
Loading map...
Location: 00/06-23-035-20W4/2
Location Alias: 00/06-23-35-20 W4M
Location Alias 2: 00/06-23-035-20 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 6-23-35-20
Operator Name: Enhance Energy Inc.
License Number: 0007959
License Date: 1954-04-22
License Status: Suspension
Spud Date: 1954-05-06
Final Drill Date: 1987-05-09
Well Total Depth: 1637.00 m
Surface Hole Latitude: 52.017332
Surface Hole Longitude: -112.758094

For data sources see[1][2]

Well History

Date Event
1954-04-22 Obtained License
1954-05-28 Intermediate Casing Operation Performed
1954-05-29 Perforation Treatment Performed - Open-Hole Completion
1954-06-02 Perforation Treatment Performed - Acid Wash - No Pressure
1973-04-19 Perforation Treatment Performed - Cement Plug
1973-04-19 Perforation Treatment Performed - Open-Hole Completion
1982-03-25 Perforation Treatment Performed - Cement Plug
1982-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-26 Perforation Treatment Performed - Jet Perforation
1983-07-23 Perforation Treatment Performed - Cement Squeeze
1983-07-26 Perforation Treatment Performed - Jet Perforation
1983-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-20 Perforation Treatment Performed - Cement Squeeze
1984-04-25 Perforation Treatment Performed - Jet Perforation
1985-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-16 Perforation Treatment Performed - Jet Perforation
1985-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-17 Perforation Treatment Performed - Cement Squeeze
1985-04-20 Perforation Treatment Performed - Jet Perforation
1985-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-24 Perforation Treatment Performed - Jet Perforation
1987-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-24 Perforation Treatment Performed - Cement Squeeze
1987-04-24 Plug Back Performed
1987-05-09 Finished Drilling
1987-05-09 Perforation Treatment Performed - Open-Hole Completion
1987-05-09 Well Mode changed to Drilled and Cased
1987-05-11 Perforation Treatment Performed - Cement Squeeze
1987-05-11 Production Casing Operation Performed
1987-05-14 Perforation Treatment Performed - Jet Perforation
1987-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-16 Rig Released
1987-05-18 Well Began Production
1987-05-18 Well Fluid changed to Crude Oil
1987-05-18 Well Mode changed to Flowing
1987-05-24 Well Fluid changed to Crude Oil
1987-05-24 Well Mode changed to Suspended
1987-07-15 Well Began Injection
1987-07-15 Well Fluid changed to Nitrogen
1987-07-15 Well Type changed to Injection
1988-11-01 Well Type changed to Observation
1989-04-20 Well Log Performed
1989-04-22 Well Log Performed
1996-12-01 Well Fluid changed to Crude Oil
1996-12-01 Well Mode changed to Flowing
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Pumping
2002-10-10 Well Fluid changed to Crude Oil
2002-10-10 Well Mode changed to Suspended
2003-01-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-05-29 Open Hole/Barefoot Completion 1589.50 1601.70 0
1983-07-27 Acid Treatment 1577.00 1582.00 0
1984-04-20 Cement Squeeze 1577.00 1582.00 0
1984-04-25 Perforation 1577.00 1579.00 13
1985-04-13 Acid Treatment 1577.00 1579.00 0
1985-04-16 Perforation 1579.80 1582.80 6
1985-04-17 Acid Treatment 1577.00 1582.80 0
1985-04-17 Cement Squeeze 1577.00 1582.80 0
1985-04-20 Perforation 1577.00 1579.00 13
1985-04-24 Perforation 1577.00 1579.00 7
1985-04-24 Acid Treatment 1577.00 1579.00 0
1954-06-02 Acid Wash 1589.50 1601.70 0
1987-04-23 Acid Treatment 1577.00 1579.00 0
1987-04-24 Cement Squeeze 1577.00 1579.00 0
1987-05-09 Open Hole/Barefoot Completion 1589.50 1637.00 0
1987-05-11 Cement Squeeze 1589.50 1637.00 0
1987-05-14 Perforation 1610.00 1612.00 13
1987-05-15 Acid Treatment 1610.00 1612.00 0
1973-04-19 Cement Plug 1593.50 1601.10 0
1973-04-19 Open Hole/Barefoot Completion 1589.50 1593.50 0
1982-03-25 Cement Plug 1585.60 1593.50 0
1982-03-26 Perforation 1580.50 1585.00 13
1982-03-26 Acid Treatment 1580.50 1585.00 0
1983-07-23 Cement Squeeze 1580.50 1585.00 0
1983-07-26 Perforation 1577.00 1582.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 167 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1996 573 0.0 0.0 0.0
1997 8539 0.0 0.0 0.0
1998 8758 0.0 0.0 0.0
1999 8565 0.0 0.0 0.0
2000 3916 0.0 0.0 0.0
2002 517 0.0 0.0 0.0

For data sources see[5]

References