X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202306000

Well Details

Well ID: 0354202306000
Loading map...
Location: 00/06-23-035-20W4/0
Location Alias: 00/06-23-35-20 W4M
Location Alias 2: 00/06-23-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 6-23-35-20
Operator Name: Enhance Energy Inc.
License Number: 0007959
License Date: 1954-04-22
License Status: Suspension
Spud Date: 1954-05-06
Final Drill Date: 1954-05-27
Well Total Depth: 1601.70 m
Surface Hole Latitude: 52.017332
Surface Hole Longitude: -112.758094

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-04-22 Obtained License
1954-05-27 Finished Drilling
1954-05-27 Well Mode changed to Drilled and Cased
1954-05-28 Production Casing Operation Performed
1954-05-29 Perforation Treatment Performed - Open-Hole Completion
1954-06-02 Perforation Treatment Performed - Acid Wash - No Pressure
1954-06-03 Well Began Production
1954-06-03 Well Fluid changed to Crude Oil
1954-06-03 Well Mode changed to Flowing
1973-04-19 Perforation Treatment Performed - Cement Plug
1973-04-19 Perforation Treatment Performed - Open-Hole Completion
1974-07-13 Well Fluid changed to Crude Oil
1974-07-13 Well Mode changed to Pumping
1982-03-25 Perforation Treatment Performed - Cement Plug
1982-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-26 Perforation Treatment Performed - Jet Perforation
1983-07-23 Perforation Treatment Performed - Cement Squeeze
1983-07-26 Perforation Treatment Performed - Jet Perforation
1983-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-20 Perforation Treatment Performed - Cement Squeeze
1984-04-23 Well Log Performed
1984-04-25 Perforation Treatment Performed - Jet Perforation
1985-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-16 Perforation Treatment Performed - Jet Perforation
1985-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-17 Perforation Treatment Performed - Cement Squeeze
1985-04-20 Perforation Treatment Performed - Jet Perforation
1985-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-24 Perforation Treatment Performed - Jet Perforation
1987-04-21 Well Log Performed
1987-04-22 Well Log Performed
1987-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-24 Perforation Treatment Performed - Cement Squeeze
1987-04-24 Plug Back Performed
1987-04-24 Well Fluid changed to Crude Oil
1987-04-24 Well Mode changed to Abandoned Zone
1987-05-13 Well Log Performed
2003-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-27 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-05-29 Open Hole/Barefoot Completion 1589.50 1601.70 0
1983-07-27 Acid Treatment 1577.00 1582.00 0
1984-04-20 Cement Squeeze 1577.00 1582.00 0
1984-04-25 Perforation 1577.00 1579.00 13
1985-04-13 Acid Treatment 1577.00 1579.00 0
1985-04-16 Perforation 1579.80 1582.80 6
1985-04-17 Acid Treatment 1577.00 1582.80 0
1985-04-17 Cement Squeeze 1577.00 1582.80 0
1985-04-20 Perforation 1577.00 1579.00 13
1985-04-24 Perforation 1577.00 1579.00 0
1985-04-24 Acid Treatment 1577.00 1579.00 0
1954-06-02 Acid Wash 1589.50 1601.70 0
1987-04-23 Acid Treatment 1577.00 1579.00 0
1987-04-24 Cement Squeeze 1577.00 1579.00 0
2003-01-27 Packing Device Capped w/Cement 1582.00 1590.00 0
1973-04-19 Cement Plug 1593.50 1601.10 0
1973-04-19 Open Hole/Barefoot Completion 1589.50 1593.50 0
1982-03-25 Cement Plug 1585.60 1593.50 0
1982-03-26 Perforation 1580.50 1585.00 13
1982-03-26 Acid Treatment 1580.50 1585.00 0
1983-07-23 Cement Squeeze 1580.50 1585.00 0
1983-07-26 Perforation 1577.00 1582.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 5074 0.0 0.0 0.0
1971 5569 0.0 0.0 0.0
1972 6992 0.0 0.0 0.0
1973 7370 0.0 0.0 0.0
1974 4569 0.0 0.0 0.0
1975 7427 0.0 0.0 0.0
1976 6616 0.0 0.0 0.0
1977 6648 0.0 0.0 0.0
1978 6888 0.0 0.0 0.0
1979 8597 0.0 0.0 0.0
1980 7054 0.0 0.0 0.0
1981 8718 0.0 0.0 0.0
1982 6939 0.0 0.0 0.0
1983 7425 0.0 0.0 0.0
1984 7563 0.0 0.0 0.0
1985 7903 0.0 0.0 0.0
1986 8416 0.0 0.0 0.0
1987 2517 0.0 0.0 0.0

For data sources see[5]

References