X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202305000

Well Details

Well ID: 0354202305000
Loading map...
Location: 00/05-23-035-20W4/0
Location Alias: 00/05-23-35-20 W4M
Location Alias 2: 00/05-23-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: CPR CONNOR NO. 5
Operator Name: Gulf Canada Limited
License Number: 0008063
License Date: 1954-05-28
License Status: RecCertified
Spud Date: 1954-06-18
Final Drill Date: 1954-07-05
Well Total Depth: 1596.50 m
Surface Hole Latitude: 52.017331
Surface Hole Longitude: -112.763957

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-05-28 Obtained License
1954-07-04 Production Casing Operation Performed
1954-07-05 Finished Drilling
1954-07-05 Perforation Treatment Performed - Open-Hole Completion
1954-07-05 Well Mode changed to Drilled and Cased
1954-07-07 Well Began Production
1954-07-07 Well Fluid changed to Crude Oil
1954-07-07 Well Mode changed to Flowing
1977-12-17 Perforation Treatment Performed - Cement Plug
1977-12-17 Perforation Treatment Performed - Open-Hole Completion
1977-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-21 Well Fluid changed to Crude Oil
1977-12-21 Well Mode changed to Pumping
1982-04-03 Perforation Treatment Performed - Cement Squeeze
1982-04-07 Perforation Treatment Performed - Jet Perforation
1982-04-08 Perforation Treatment Performed - Fractured
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Suspended
1991-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-27 Perforation Treatment Performed - Jet Perforation
1991-09-27 Perforation Treatment Performed - Remedial Casing
1991-09-27 Plug Back Performed
1991-09-27 Well Fluid changed to Crude Oil
1991-09-27 Well Mode changed to Abandoned
1991-10-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-05 Open Hole/Barefoot Completion 1584.40 1596.50 0
1991-09-27 Perforation 203.00 203.50 13
1991-09-27 Remedial Casing Cementing 203.00 203.50 0
1977-12-17 Cement Plug 1585.60 1596.50 0
1977-12-17 Open Hole/Barefoot Completion 1584.40 1585.60 0
1977-12-20 Acid Treatment 1584.40 1585.60 0
1982-04-03 Cement Squeeze 1584.40 1585.60 0
1982-04-07 Perforation 1581.30 1583.70 13
1982-04-08 Fracture 1581.30 1583.70 0
1991-09-24 Acid Treatment 1581.30 1583.70 0
1991-09-27 Packing Device Capped w/Cement 1446.00 1454.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5351 0.0 0.0 0.0
1968 4894 0.0 0.0 0.0
1969 4827 0.0 0.0 0.0
1970 3588 0.0 0.0 0.0
1971 4305 0.0 0.0 0.0
1972 6769 0.0 0.0 0.0
1973 7675 0.0 0.0 0.0
1974 7062 0.0 0.0 0.0
1975 5698 0.0 0.0 0.0
1976 5616 0.0 0.0 0.0
1977 3465 0.0 0.0 0.0
1978 6632 0.0 0.0 0.0
1979 7621 0.0 0.0 0.0
1980 7702 0.0 0.0 0.0
1981 8452 0.0 0.0 0.0
1982 3365 0.0 0.0 0.0

For data sources see[5]

References