X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202303002

Well Details

Well ID: 0354202303002
Loading map...
Location: 00/03-23-035-20W4/2
Location Alias: 00/03-23-35-20 W4M
Location Alias 2: 00/03-23-035-20 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 3-23-35-20
Operator Name: Enhance Energy Inc.
License Number: 0008199
License Date: 1954-07-07
License Status: Issued
Spud Date: 1954-10-30
Final Drill Date: 1997-02-01
Well Total Depth: 1621.00 m
Surface Hole Latitude: 52.013714
Surface Hole Longitude: -112.758803

For data sources see[1][2]

Well History

Date Event
1954-07-07 Obtained License
1954-11-20 Perforation Treatment Performed - Open-Hole Completion
1954-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-22 Perforation Treatment Performed - Cement Squeeze
1977-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-23 Perforation Treatment Performed - Jet Perforation
1982-07-21 Perforation Treatment Performed - Cement Squeeze
1982-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-23 Perforation Treatment Performed - Jet Perforation
1984-06-14 Perforation Treatment Performed - Cement Squeeze
1984-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-16 Perforation Treatment Performed - Jet Perforation
1985-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-10 Perforation Treatment Performed - Jet Perforation
1985-04-13 Perforation Treatment Performed - Cement Squeeze
1985-04-17 Perforation Treatment Performed - Jet Perforation
1985-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-28 Perforation Treatment Performed - Cement Squeeze
1994-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-31 Perforation Treatment Performed - Jet Perforation
1997-01-23 Perforation Treatment Performed - Cement Squeeze
1997-01-23 Plug Back Performed
1997-01-29 Liner Casing Operation Performed
1997-02-01 Finished Drilling
1997-02-01 Well Mode changed to Drilled and Cased
1997-02-02 Perforation Treatment Performed - Jet Perforation
1997-02-02 Well Log Performed
1997-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-06 Rig Released
1997-02-07 Well Began Production
1997-02-07 Well Fluid changed to Crude Oil
1997-02-07 Well Mode changed to Pumping
1997-12-02 Perforation Treatment Performed - Chemical Squeeze
2002-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-28 Perforation Treatment Performed - Jet Perforation
2002-05-28 Plug Back Performed
2002-05-28 Well Fluid changed to Crude Oil
2002-05-28 Well Log Performed
2002-05-28 Well Mode changed to Abandoned Zone
2002-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-20 Open Hole/Barefoot Completion 1601.70 1614.20 0
1984-06-16 Perforation 1590.40 1592.00 13
1984-06-16 Acid Treatment 1590.40 1592.00 0
1985-04-10 Perforation 1593.00 1599.00 13
1985-04-10 Acid Treatment 1590.40 1599.00 0
1985-04-13 Cement Squeeze 1590.40 1599.00 0
1985-04-17 Perforation 1589.40 1590.90 13
1985-04-18 Acid Treatment 1589.40 1590.90 0
1994-05-28 Cement Squeeze 1589.40 1590.90 0
1994-05-31 Perforation 1586.70 1588.70 18
1994-05-31 Acid Treatment 1586.70 1588.70 0
1954-11-22 Acid Treatment 1601.70 1614.20 0
1997-01-23 Cement Squeeze 1586.70 1588.70 0
1997-02-02 Perforation 1619.50 1621.00 13
1997-02-03 Acid Treatment 1619.50 1621.00 0
1997-12-02 Chemical Squeeze 1619.50 1621.00 0
2002-05-28 Packing Device Capped w/Cement 1604.00 1612.00 0
2002-05-28 Perforation 1586.70 1587.70 14
2002-05-29 Acid Treatment 1586.70 1587.70 0
1977-04-22 Cement Squeeze 1601.70 1614.20 0
1977-04-23 Perforation 1596.50 1599.60 13
1977-04-23 Acid Treatment 1596.50 1599.60 0
1982-07-21 Cement Squeeze 1596.50 1599.60 0
1982-07-23 Perforation 1590.50 1593.50 13
1982-07-23 Acid Treatment 1590.50 1593.50 0
1984-06-14 Cement Squeeze 1590.50 1593.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 7046 0.0 0.0 0.0
1998 8738 0.0 0.0 0.0
1999 5317 0.0 0.0 0.0

For data sources see[5]

References