X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202303000

Well Details

Well ID: 0354202303000
Loading map...
Location: 00/03-23-035-20W4/0
Location Alias: 00/03-23-35-20 W4M
Location Alias 2: 00/03-23-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 3-23-35-20
Operator Name: Enhance Energy Inc.
License Number: 0008199
License Date: 1954-07-07
License Status: Issued
Spud Date: 1954-10-30
Final Drill Date: 1954-11-19
Well Total Depth: 1614.20 m
Surface Hole Latitude: 52.013714
Surface Hole Longitude: -112.758803

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-07-07 Obtained License
1954-11-19 Finished Drilling
1954-11-19 Well Mode changed to Drilled and Cased
1954-11-20 Perforation Treatment Performed - Open-Hole Completion
1954-11-20 Production Casing Operation Performed
1954-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-11-23 Well Began Production
1954-11-23 Well Fluid changed to Crude Oil
1954-11-23 Well Mode changed to Flowing
1977-04-22 Perforation Treatment Performed - Cement Squeeze
1977-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-23 Perforation Treatment Performed - Jet Perforation
1977-04-23 Well Fluid changed to Crude Oil
1977-04-23 Well Mode changed to Pumping
1982-07-21 Perforation Treatment Performed - Cement Squeeze
1982-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-23 Perforation Treatment Performed - Jet Perforation
1984-06-14 Perforation Treatment Performed - Cement Squeeze
1984-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-16 Perforation Treatment Performed - Jet Perforation
1985-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-10 Perforation Treatment Performed - Jet Perforation
1985-04-13 Perforation Treatment Performed - Cement Squeeze
1985-04-17 Perforation Treatment Performed - Jet Perforation
1985-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-25 Well Log Performed
1994-05-28 Perforation Treatment Performed - Cement Squeeze
1994-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-31 Perforation Treatment Performed - Jet Perforation
1996-01-29 Well Log Performed
1997-01-23 Perforation Treatment Performed - Cement Squeeze
1997-01-23 Plug Back Performed
1997-01-23 Well Fluid changed to Crude Oil
1997-01-23 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-20 Open Hole/Barefoot Completion 1601.70 1614.20 0
1984-06-16 Perforation 1590.40 1592.00 13
1984-06-16 Acid Treatment 1590.40 1592.00 0
1985-04-10 Perforation 1593.00 1599.00 13
1985-04-10 Acid Treatment 1590.40 1599.00 0
1985-04-13 Cement Squeeze 1590.40 1599.00 0
1985-04-17 Perforation 1589.40 1590.90 13
1985-04-18 Acid Treatment 1589.40 1590.90 0
1994-05-28 Cement Squeeze 1589.40 1590.90 0
1994-05-31 Perforation 1586.70 1588.70 18
1994-05-31 Acid Treatment 1586.70 1588.70 0
1954-11-22 Acid Treatment 1601.70 1614.20 0
1997-01-23 Cement Squeeze 1586.70 1588.70 0
1977-04-22 Cement Squeeze 1601.70 1614.20 0
1977-04-23 Perforation 1596.50 1599.60 13
1977-04-23 Acid Treatment 1596.50 1599.60 0
1982-07-21 Cement Squeeze 1596.50 1599.60 0
1982-07-23 Perforation 1590.50 1593.50 13
1982-07-23 Acid Treatment 1590.50 1593.50 0
1984-06-14 Cement Squeeze 1590.50 1593.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1977 3709 0.0 0.0 0.0
1978 6840 0.0 0.0 0.0
1979 7201 0.0 0.0 0.0
1980 6829 0.0 0.0 0.0
1981 8729 0.0 0.0 0.0
1982 7911 0.0 0.0 0.0
1983 7916 0.0 0.0 0.0
1984 7836 0.0 0.0 0.0
1985 7924 0.0 0.0 0.0
1986 8255 0.0 0.0 0.0
1987 8404 0.0 0.0 0.0
1988 8770 0.0 0.0 0.0
1989 8299 0.0 0.0 0.0
1990 8645 0.0 0.0 0.0
1991 8343 0.0 0.0 0.0
1992 8773 0.0 0.0 0.0
1993 8041 0.0 0.0 0.0
1994 8522 0.0 0.0 0.0
1995 8739 0.0 0.0 0.0
1996 8699 0.0 0.0 0.0
1997 480 0.0 0.0 0.0

For data sources see[5]

References