X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202302022

Well Details

Well ID: 0354202302022
Loading map...
Location: 02/02-23-035-20W4/2
Location Alias: 02/02-23-35-20 W4M
Location Alias 2: 02/02-23-035-20 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH 102 FENNBV 2-23-35-20
Operator Name: Enhance Energy Inc.
License Number: 0102474
License Date: 1983-08-02
License Status: Issued
Spud Date: 1983-08-02
Final Drill Date: 1983-08-15
Well Total Depth: 1672.00 m
Surface Hole Latitude: 52.014441
Surface Hole Longitude: -112.753228

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-02 Direction Drilling Operation Performed - 98
1983-08-02 Obtained License
1983-08-15 Finished Drilling
1983-08-15 Well Mode changed to Drilled and Cased
1983-08-17 Production Casing Operation Performed
1983-09-14 Perforation Treatment Performed - Jet Perforation
1987-05-23 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-09 Well Log Performed
1988-04-03 Well Log Performed
1995-04-12 Well Log Performed
1995-04-13 Perforation Treatment Performed - Cement Squeeze
1995-04-13 Plug Back Performed
1995-04-18 Perforation Treatment Performed - Jet Perforation
1995-04-18 Well Log Performed
1995-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-02 Well Log Performed
1996-04-03 Perforation Treatment Performed - Jet Perforation
1996-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-24 Perforation Treatment Performed - Jet Perforation
1997-01-19 Perforation Treatment Performed - Cement Squeeze
1997-01-31 Perforation Treatment Performed - Jet Perforation
1997-01-31 Well Log Performed
1997-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-24 Well Began Production
1997-02-24 Well Fluid changed to Crude Oil
1997-02-24 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-08-02 1491.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-14 Perforation 1612.50 1614.50 13
1996-11-24 Perforation 1638.70 1639.20 18
1997-01-19 Cement Squeeze 1604.00 1615.00 0
1997-01-31 Perforation 1603.00 1604.50 18
1997-01-31 Perforation 1637.80 1639.30 18
1997-02-01 Acid Treatment 1603.00 1604.50 0
1997-02-04 Acid Treatment 1637.80 1639.30 0
1987-05-23 Acid Wash 1612.50 1614.50 0
1995-04-13 Cement Squeeze 1612.50 1614.50 0
1995-04-18 Perforation 1614.50 1615.00 18
1995-04-19 Acid Treatment 1614.50 1615.00 0
1996-04-03 Perforation 1604.00 1605.50 16
1996-04-03 Perforation 1607.50 1609.00 16
1996-04-03 Perforation 1611.00 1612.50 16
1996-04-05 Acid Treatment 1604.00 1615.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 7287 0.0 0.0 0.0
1998 8322 0.0 0.0 0.0
1999 8580 0.0 0.0 0.0
2000 8502 0.0 0.0 0.0
2001 8460 0.0 0.0 0.0
2002 7756 0.0 0.0 0.0
2005 3472 0.0 0.0 0.0
2006 8696 0.0 0.0 0.0
2007 8720 0.0 0.0 0.0
2008 7459 0.0 0.0 0.0
2009 288 0.0 0.0 0.0
2010 8422 0.0 0.0 0.0
2011 7457 0.0 0.0 0.0
2012 7904 0.0 0.0 0.0
2013 8535 0.0 0.0 0.0
2014 8458 0.0 0.0 0.0
2015 6815 0.0 0.0 0.0
2017 5132 0.0 0.0 0.0
2018 8561 0.0 0.0 0.0
2019 8684 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References